Brahma Bull
Opticomm are ridiculous. That is all.
What's the deal with Opticomm? Do they just lay infrastructure or an ISP as well?
I assume Opticomm will lay the cable and then you're free to choose your ISP?
Browse Forums Building A New House Re: Who else is building at Oran Park? 4761Aug 06, 2015 3:45 pm Built a Masterton's Symphony Elite @ Oran Park Slab pour 01/03/16 PCI 28/09/16 Keys 7/10/16 Re: Who else is building at Oran Park? 4762Aug 06, 2015 4:43 pm $395 Fixed Priced Landscape Plans for DA M: 0435 127 244 | W: bluegumdesign.com.au | E: info@bluegumdesign.com.au Residential | Commercial | Industrial Re: Who else is building at Oran Park? 4768Aug 13, 2015 9:19 am Built a Masterton's Symphony Elite @ Oran Park Slab pour 01/03/16 PCI 28/09/16 Keys 7/10/16 Re: Who else is building at Oran Park? 4774Aug 13, 2015 8:33 pm Hi Everyone, Need a bit of help/advise. My builder has quoted me a price which leaves the Alfresco area and Porch area just concrete flooring. (Yes, No tiles). I have an option to add on, which they will charge me $2,200 approx. I was wondering, how much does it cost if I do it after handover through some third party or even by myself (!). Alfresco 10.55sqm Porche 0.83sqm Please advise considering a basic tiles range or what other options are there for me ? Cheees Guys ! Re: Who else is building at Oran Park? 4775Aug 14, 2015 6:59 am Ridwan Hi Everyone, Need a bit of help/advise. My builder has quoted me a price which leaves the Alfresco area and Porch area just concrete flooring. (Yes, No tiles). I have an option to add on, which they will charge me $2,200 approx. I was wondering, how much does it cost if I do it after handover through some third party or even by myself (!). Alfresco 10.55sqm Porche 0.83sqm Please advise considering a basic tiles range or what other options are there for me ? Cheees Guys ! Hey mate, I tiled my alfresco area last year, it was approx 20 Sqm, my wife found tiles she liked at Beaumont tiles they cost us approx 300 and I then wondered around some houses being built found a tiler and got them to come around and give a cash quote- ended up getting his services for 900 bucks and in 2 days was all done. Re: Who else is building at Oran Park? 4776Aug 14, 2015 9:22 am Woho !! Thats better. So you finished it around 1k. I think I would rather do it after handover Cheers Scoobar88 Ridwan Hi Everyone, Need a bit of help/advise. My builder has quoted me a price which leaves the Alfresco area and Porch area just concrete flooring. (Yes, No tiles). I have an option to add on, which they will charge me $2,200 approx. I was wondering, how much does it cost if I do it after handover through some third party or even by myself (!). Alfresco 10.55sqm Porche 0.83sqm Please advise considering a basic tiles range or what other options are there for me ? Cheees Guys ! Hey mate, I tiled my alfresco area last year, it was approx 20 Sqm, my wife found tiles she liked at Beaumont tiles they cost us approx 300 and I then wondered around some houses being built found a tiler and got them to come around and give a cash quote- ended up getting his services for 900 bucks and in 2 days was all done. Re: Who else is building at Oran Park? 4777Aug 14, 2015 9:32 am Scoobar88 Ridwan Hi Everyone, Need a bit of help/advise. My builder has quoted me a price which leaves the Alfresco area and Porch area just concrete flooring. (Yes, No tiles). I have an option to add on, which they will charge me $2,200 approx. I was wondering, how much does it cost if I do it after handover through some third party or even by myself (!). Alfresco 10.55sqm Porche 0.83sqm Please advise considering a basic tiles range or what other options are there for me ? Cheees Guys ! Hey mate, I tiled my alfresco area last year, it was approx 20 Sqm, my wife found tiles she liked at Beaumont tiles they cost us approx 300 and I then wondered around some houses being built found a tiler and got them to come around and give a cash quote- ended up getting his services for 900 bucks and in 2 days was all done. Yeh mate do it after hand over you can always negotiate prices of the product and the tradie. Re: Who else is building at Oran Park? 4778Aug 16, 2015 12:18 pm FYI FOLKS - Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ DELAYED RELEASES - 5D 10A-10B OPEN QUESTIONS - What is 15A at the bottom with lots 901-912? Does anyone know? OPEN THOUGHTS - I have no confidence that other releases would rego as said, the reason being if OPT keeps adding releases like 21A-21B which are being worked upon faster than other releases then all other releases would keep getting impacted and suffer. BTW these 2 release are ready as i have been to OPT last weekend and could see it for myself. My release 10F says Early 2016 and i have no confidence in that. But i am sure it will move to MID 2016. Really frustrated for now....................... Cheerio OB! Re: Who else is building at Oran Park? 4780Aug 18, 2015 6:42 pm Hi to all following the thread. When my family purchased in release 4E we put our deposit down on 14 dec 2013 we were told should be ready sept oct 2014, this date came around then was extended to dec 2014 when dec 2014 came, this was extended to march april 2015, april 2015 came and we were told its any day now. We settled on our block of land on the 14 may 2015 12384 hours 516 days 73 weeks and 5 days 1 year and 5 months The above shows just how long it took to say it was frustrating is an UNDERSTATEMENT In saying that i would not change it for the world so happy and excited that my family is moving to such a great area with a bright future. A survey must’ve completed by a certified surveyor. This form part of every DA requirement 3 223639 |