Browse Forums Building A New House Re: mak_ - build in Mernda Villages - Darnley29? 25Oct 11, 2011 3:39 pm Cheers, Alpal Building PD Heathmont 40 BLOG: http://alpal-pd-heathmont40.blogspot.com/ Deposit paid 19/08/2011 Contract signing 3/10/2011 Site Start 10/11/2011 Slab 23/11/2011 mak_ - Our Monaco Q1 - Mernda Villages 36Nov 28, 2011 5:51 pm Mak_, Henley were really good about us having a pool installed first, as long as there was at least a temp safety fence, it was more than a few metres from the house (so it did not interfere with the slab) and the pool was boarded up. However all landscaping work had to then wait until after handover. Chatz Re: mak_ - Our Monaco Q1 - Mernda Villages 37Dec 01, 2011 8:28 am Hey Chatz, Henley rang me back on Tuesday. They said it was too late because they are ready to start. There was (what they thought) was a mix up they wanted to clarify. We wanted the glass on the door frosted, but the side lights as clear...they thought it was a mistake and wanted to make sure that IS how we wanted it. They said the pool will be easier for them AFTER handover, that's sweet...I checked last night and the 2 blocks next to us are still not sold Fingers crossed we see something Monday!!! Re: mak_ - Our Monaco Q1 - Mernda Villages 38Dec 06, 2011 7:37 am Got a call from henley, we have a site supervisor and appointed our CSC.woooooo. She said they will have a meeting on Wednesday and to watch our for site start date letter in the mail by Friday!!!!! This is 100% true. You can not hang anything on steel frames. very frustrating 8 8033 Regardless of wall hung toilet or floor pan toilet your feet will be right on drain, seems to me the waste should not be in that location given the design. Also are you… 6 7048 This certainly doesn't look good. I would be engaging with an independent inspector to have a look at this. As for the unscheduled site visits, most builders are quite… 1 28322 |