I have batten and noggin provisioned for future pendent lights, in downstairs.
At the handover, what does that look like?
1. Argus takes the wire through the ceiling and leave it visible?
2. Or the cable is left inside the ceiling near the noggin for an electrician to fishout?
If it is #2 does it make sense to raise a variation for Argus to install a globe/chinaman hat, so that they have to fishout the cable. I'm trying to prevent possible damages to the ceiling by the electricians post handover.
Hi Kush, they install a standard light fitting with a 'chinaman's hat' light fitting.