Browse Forums Building A New House First time builder with DAH - Keyed 146Mar 04, 2012 9:34 pm my new build thread- Ben Trager https://forum.homeone.com.au/viewtopic.php?f=31&t=89826 my switch build thread (2011) https://forum.homeone.com.au/viewtopic.php?f=31&t=36569 Re: First time builder with DAH - Keyed 149Mar 05, 2012 10:24 am Preliminary agreement 23/11 Contract 22/03 Prestart 06/04 - finalised on 30/04 Unconditional approval 10/05 Demolition 05/07 Slab 26/08 Brickwork 13/09-06/10 Roof frame started 07/10 viewtopic.php?f=31&t=32292 Re: First time builder with DAH - Hopefully this is the end 157Jun 26, 2012 3:08 pm Building the Nautilus with Dale Alcock follow my thread: viewtopic.php?f=31&t=58854&p=909574#p909574 14/8/12 Pre-start! Re: First time builder with DAH - Hopefully this is the end 158Jun 26, 2012 3:32 pm Althom - unfortunately they are all the same – nobody cares - "she'll be right mate!!" is still the moto... Preliminary agreement 23/11 Contract 22/03 Prestart 06/04 - finalised on 30/04 Unconditional approval 10/05 Demolition 05/07 Slab 26/08 Brickwork 13/09-06/10 Roof frame started 07/10 viewtopic.php?f=31&t=32292 Re: First time builder with DAH - Hopefully this is the end 159Jun 26, 2012 3:44 pm We'll wait and see how the cleanup goes tomorrow - damages resulting from lack of care will be billed to DAH but hopefully, as they've assured us, the splashes will simply wipe off. Still can't understand though why an alleged professional doesn't understand enough to use dropsheets and masking tape. Re: First time builder with DAH - Hopefully this is the end 160Jun 26, 2012 3:52 pm they are too good for them Preliminary agreement 23/11 Contract 22/03 Prestart 06/04 - finalised on 30/04 Unconditional approval 10/05 Demolition 05/07 Slab 26/08 Brickwork 13/09-06/10 Roof frame started 07/10 viewtopic.php?f=31&t=32292 Minimum overhang into gutter must be 50mm, turn down tool should not split the sheet. it seems wrong tool for the profile was used, the flashing cannot slope back. Rib… 2 2128 Electrical just got back to me and said the most they can provide is a single power point on the Bedroom 1 side of that wall. After handover, your towel rail installer… 2 3848 |