Yes, we were charged a price for both - Upper and Ground Floor.
Browse Forums Building A New House Re: Porter Davis homes 6763Mar 02, 2013 6:37 pm Land settled May '14. Building the PD Hoffman39: 5/11=site start, 13/11=slab pour, 26/11=frame complete, 10/12=roof on, 12/12=bricking started. Blog: http://jyndeira.net/blog/ Re: Porter Davis homes 6764Mar 03, 2013 1:56 pm Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 6770Mar 04, 2013 7:05 pm Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 6773Mar 04, 2013 7:49 pm Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 6774Mar 04, 2013 7:51 pm Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 6778Mar 04, 2013 10:52 pm jnkbids Silly question.. but I assume the roof to my house isn't complete right? The huge silver gutter between the tiles will be covered correct? Oh.. yes.. i did notice that a roof tile has been pushed upwards due to the poor laying of a pipe which hopefully will be rectified soon Hi That looks normal mate. There usually a 10cm gap or so where that meet for cleaning and you'll always see the sliver gutter. Actually your tiles make cutting the angle rather neat so your looks very impressive. We've got the curvy tiles and they look harder to cut them all straight. Or at least that's what I assumed. And yes, the pipe looks unacceptable, send the photo it to your BC now for addressing now rather then waiting for PCI... And ask for photos when they complete it so you dont have to necessarily get up a ladder... Thanks Mike Re: Porter Davis homes 6779Mar 05, 2013 8:14 am jnkbids Silly question.. but I assume the roof to my house isn't complete right? Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ The huge silver gutter between the tiles will be covered correct? Oh.. yes.. i did notice that a roof tile has been pushed upwards due to the poor laying of a pipe which hopefully will be rectified soon Silver lining is called a valley. Apart from the raised tile (where air-con drainage pipe is located) it looks fine. Water will obviously run downwards (22.5 degree pitched roof) and won't sit around pooling. Roof looks like it’s finished off neatly. Re: Porter Davis homes 6780Mar 05, 2013 8:36 am Team PD ftdt7882 What is a reasonable time frame to expect some answers from our Sales Consultant & Building Co-ordinator? I sent my BC an email on the 19th Feb with a list of questions (to do with pricing and a few other structural things), he emailed back saying he would get back to me by the end of the week. On the 22nd he called and said he would forward my queries onto our Sales Consultant, our SC emailed that day and said he would get back to me. I haven't heard a thing and I have emailed the SC once last week asking for an update and still no response and I haven't had an update from either of them. I don't want to be pushy, but to me two weeks for a list of questions (admittedly it was literally 20 questions!) seems a bit long? Am I being unreasonable?! I don't know how long these things usually take!!!! Hi ftdt7882, If you would like to PM me with your contact and build details, I will have this followed up for you. Cheers, Helen Hi Helen, Thank you, I have phoned my BC this morning and left an email message, waiting to hear back so if I don't have any luck I'll be in touch ftdt Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report 3 12320 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 74688 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 105490 |