HD
I remember your post about your Tender appointment. Hopefully your contract appointment goes smoothly, come back and let us know how you go?
Browse Forums Building A New House Re: Porter Davis homes 6737Feb 27, 2013 9:24 pm jnkbids tstr1a Last week I had my 12 months maintenance inspection and the inspector was a top bloke, every defect I mentioned he agreed and organised to fix. the maintenance team called me promptly and organised all the trades for next week. Really happy with my PD experience so far. Ugh u have been really lucky so far... mine has ranged from excellent to bad to excellent to bad.... repeat cycle endlessly the plasterers came in today and plaster the walls and ceilings even though there are still outstanding issues from pre-plaster report. has anyone gotten PD to remove plaster walls to show evidence of defects being repaired? I highly doubt any tradespeople came to fix things between 4pm yesterday afternoon and 7am this morning to enable the plastering to happen at 8 am this morning just had a look at ur blog. I made sure that the butlers pantry rangehood vented outside as well. Re: Porter Davis homes 6738Feb 27, 2013 9:28 pm tstr1a just had a look at ur blog. I made sure that the butlers pantry rangehood vented outside as well. Yeah.. that was the plan.. until some "genius" decided to place the pipe almost 1.5metres away from the external vent so now the rangehood vents to NOWHERE!! You know HEAPS about construction,do you know how PD would ensure the toilet exhaust fan for the downstairs bathrooms actually connect to the external vents? it seems a looong way to randomly shove a pipe and hope for the best when the ceiling is already installed Re: Porter Davis homes 6739Feb 27, 2013 9:30 pm they will only listen to their inspectors reports. per building regs the stages which must be approved are: pre-slab slab framing compliance at the end, roof plumbing, plumbing, electrical, water proofing and energy rating. the rest are the other inspections are irrelevant to builders (pre-plaster, fixing, PCI), actually not required. As a customer you need to ensure that work is per the regs and 2007 standards & tolerance. Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report 3 12345 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 74715 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 105589 |