Browse Forums Building A New House Re: Masterton Homes - The new thread 3.0 1682Feb 24, 2013 12:05 pm Masterton Villina 36 - 2011 Jul-SLAB Aug-FRAME Nov-BRICK+ROOF Dec-INSUL Jan-GYPROCK Feb-LOCKUP Mar-PCI Apr-KEYS+MOVE May-Driveway+Landscaping Blog - http://new-lindfield-house.blogspot.com.au/ Re: Masterton Homes - The new thread 3.0 1685Feb 25, 2013 7:54 pm Masterton Symphony MBTF @ The Ponds 2012 Mar. Commencement May. Plans Jun. Contracts Aug. Selections Sep. DA Oct. Construction Nov. Slab, Frames, Bricks Dec.Roof 2013 Jan. Lockup, Fit out Re: Masterton Homes - The new thread 3.0 1686Feb 25, 2013 7:57 pm 28/5 3.5K 1/8 Final Plans 20/9 Contracts/Selections 29/10 Council appr, CC 15/11 Scrape, peering 21/12 Slabbed, framed, bricks start 22/1 Bricks & roof comp 20/2 Lock up 5/4 Moved in and PCI Re: Masterton Homes - The new thread 3.0 1687Feb 25, 2013 8:01 pm viewtopic.php?f=31&t=46741 Clovelly - Masterton Homes 5% to M 290312 CDC 21/06 20 days 29/08 Slab 17/09 Frame 26/09 Bricks 24/10 Roof tiles 20/11 Re: Masterton Homes - The new thread 3.0 1689Feb 25, 2013 9:14 pm Masterton Symphony MBTF @ The Ponds 2012 Mar. Commencement May. Plans Jun. Contracts Aug. Selections Sep. DA Oct. Construction Nov. Slab, Frames, Bricks Dec.Roof 2013 Jan. Lockup, Fit out Re: Masterton Homes - The new thread 3.0 1690Feb 26, 2013 6:22 am 28/5 3.5K 1/8 Final Plans 20/9 Contracts/Selections 29/10 Council appr, CC 15/11 Scrape, peering 21/12 Slabbed, framed, bricks start 22/1 Bricks & roof comp 20/2 Lock up 5/4 Moved in and PCI Re: Masterton Homes - The new thread 3.0 1691Feb 26, 2013 6:26 am 28/5 3.5K 1/8 Final Plans 20/9 Contracts/Selections 29/10 Council appr, CC 15/11 Scrape, peering 21/12 Slabbed, framed, bricks start 22/1 Bricks & roof comp 20/2 Lock up 5/4 Moved in and PCI Re: Masterton Homes - The new thread 3.0 1693Feb 26, 2013 6:38 am viewtopic.php?f=31&t=46741 Clovelly - Masterton Homes 5% to M 290312 CDC 21/06 20 days 29/08 Slab 17/09 Frame 26/09 Bricks 24/10 Roof tiles 20/11 Re: Masterton Homes - The new thread 3.0 1695Feb 26, 2013 9:03 am Masterton Villina 36 - 2011 Jul-SLAB Aug-FRAME Nov-BRICK+ROOF Dec-INSUL Jan-GYPROCK Feb-LOCKUP Mar-PCI Apr-KEYS+MOVE May-Driveway+Landscaping Blog - http://new-lindfield-house.blogspot.com.au/ Re: Masterton Homes - The new thread 3.0 1696Feb 26, 2013 3:25 pm Masterton Villina 36 - 2011 Jul-SLAB Aug-FRAME Nov-BRICK+ROOF Dec-INSUL Jan-GYPROCK Feb-LOCKUP Mar-PCI Apr-KEYS+MOVE May-Driveway+Landscaping Blog - http://new-lindfield-house.blogspot.com.au/ Re: Masterton Homes - The new thread 3.0 1697Feb 26, 2013 5:29 pm hmm replying to my own post. It's quiet today here, but not at our building site. Bath-tubs installed today, along with the garage door and a few fineries. But I have a question, particularly for those that are at PCI or beyond, in a double-storey home. Did you have a weird vent access-panel installed below the s-bend for each of your bath-tubs??? Check the photo out - one in our Great Room, and another in the laundry. I can just make out the s-bend through the vent shafts. I've never seen something so d0dgey!! Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Has this happened to anyone else?? Masterton Villina 36 - 2011 Jul-SLAB Aug-FRAME Nov-BRICK+ROOF Dec-INSUL Jan-GYPROCK Feb-LOCKUP Mar-PCI Apr-KEYS+MOVE May-Driveway+Landscaping Blog - http://new-lindfield-house.blogspot.com.au/ Re: Masterton Homes - The new thread 3.0 1698Feb 26, 2013 5:56 pm ![]() hmm replying to my own post. It's quiet today here, but not at our building site. Bath-tubs installed today, along with the garage door and a few fineries. But I have a question, particularly for those that are at PCI or beyond, in a double-storey home. Did you have a weird vent access-panel installed below the s-bend for each of your bath-tubs??? Check the photo out - one in our Great Room, and another in the laundry. I can just make out the s-bend through the vent shafts. I've never seen something so d0dgey!! Has this happened to anyone else?? I would think if the S-bend is blocked, they need access to unblock it? But sure these days plumbers can unblock from above ![]() I will check with my SS if this is the case for us as well ![]() ![]() Re: Masterton Homes - The new thread 3.0 1699Feb 26, 2013 6:53 pm Jo & Waz, Yes the stupid vents are installed below the baths. We couldn't get them to remove them and we tried pretty hard - hope you have more luck. We ended up with a laundry spout in our bathrooms cause normal spouts wouldn't reach.... hows that for planning. Nugget I'd be getting Dept of Fair Trading involved - M excel at drawing things out and waiting for you to give up. Never argue with an idiot they drag you down to their level & then beat you with experience - Dilbert View Thread: viewtopic.php?f=31&t=19733 Contract signed 14Sept Slab 30Sept Bricks laid 1Dec Lock up 26Feb Keys 10Jun Re: Masterton Homes - The new thread 3.0 1700Feb 26, 2013 8:08 pm Quick question to the ones who have their door handles on and also opted for the mansion package,do you have the upgraded door handle on your internal garage door as we have the crappy round one like our laundry door and when i brought it up with our ss at pci he insisted they dont put it on that door even when i showed him otherwise on our colour selection sheet. 4 17339 Hi, Apologies - I know there is plenty out there on this but struggling to put together the puzzle. We're planning our garage/external laundry to master bedroom and… 0 12851 Hi there! Putting the feelers out there for those who have (or almost) built with Arli homes! Interested in your experiences who've built from their stock home designs… 0 27165 |