Browse Forums Building A New House Re: Things you forget - summary page 27 562Jan 17, 2013 8:49 pm SunshineT's Build: viewtopic.php?f=31&t=34585 Designs start: 4/12/09 DA: 5/7/11 Demo: 22/12/11 Slab: 24/2/12 Keys: 31/8/12 Re: Things you forget - summary page 27 563Jan 18, 2013 1:01 pm H1 Thread - viewtopic.php?f=31&t=61557 Re: Things you forget - summary page 27 566Jan 26, 2013 11:38 pm June12 - Land settlement (18 x 27.5) Jan13 - External selections complete April13 - Selections complete viewtopic.php?f=31&t=60306 Re: Things you forget - summary page 27 571Feb 02, 2013 10:26 pm Undermount sink - don't forget to consider an undermount sink with a drainer. Build thread: here Land Nov 12, Contract 6/07/13, Consent 15/08/13, Start 20/09/13, Slab 25/09/13, Frame 4/10/13, Brick 21/10/13, Roof 2/11/13, Lock-up 17/12/13, Handover 3/3/14 The things you need to check ..... 572Feb 07, 2013 9:29 am ... after living in our house for 17 months we realised on the weekend that the downlights in the two niches in the hallway are not centred ..... We had visitors flor lunch on Sunday and they noticed it ... we've only recently hung something in the niches so never really looked at them too closely before ... quality build my @rse Add this to the list of things to check at PCI wherever you have lights that should be centred!!!! For info on our build: viewtopic.php?f=31&t=43093 Built the McLaren by Dechellis - slab down 22 Feb - handover 30 Aug 2011 - and gardens finished 9 Dec 2012!! Re: Things you forget - summary page 27 573Feb 13, 2013 8:26 am We requested our HWS to be moved back approx 1 meter down the side of the house to allow for sufficient room for the gate to swing open and to get past. We also almost forgot to request fly screen doors to our alfresco. We had fly screens included in the promotion so didn't think about it. Re: Things you forget - summary page 27 574Feb 17, 2013 9:41 am Unexpected costs - we received a bill from Energy Aust (ETSA) for around $250 to upgrade the single phase meter to three phase. Checked with the builder as we paid extra for three phase who replied with "The attached bill is for the meter. We do not supply the meter, the provider supplies the meter. Therefore the attached bill is for the supply of the 3 phase electricity meter which is not a part of our scope of works". It would have helped if we were advised of this when we upgraded to three phase. Another unexpected cost - SA Water had been sending bills to our allotment which were returned to them since Oct 2011, they have just found us in our rental and sent a bill for over $900 I have now been advised that we still have to pay for the water even though it's not connected "because it runs past our allotment and can be connected in the future", so if you're not receiving bills from them, check to see if they have your current address. https://forum.homeone.com.au/viewtopic.php?f=31&t=43937&start=0 Bought a block in Golden Grove - Jan 2011 Finally finished our design, Mar 2012, *yay* Signed with ADH council consent June 12 Re: Things you forget - summary page 27 575Feb 20, 2013 5:21 pm Hi Everyone, It is my first post here. Just wanted to say hello and thank you for all the great tips here. We are at the beginning and I'm just thinking about starting our own building thread However, at the moment, I spend most of my free time reading this forum. Its great! Eva Live Love Lough Building thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=74918 Building blog: http://uniquebyeva.com.au/ourhome/ Our food forest blog: http://www.foodforestcookery.com Re: Things you forget - summary page 27 578Mar 02, 2013 1:33 pm Have compiled my own list now - thanks to those who contributed!! Re: Things you forget - summary page 27 579Mar 03, 2013 2:08 pm a BIG THANK YOU to all who contributed to this... it's pretty amazing. I now have a long list of things to look out for, in our new build. One other thing I'm thinking of doing is, having weather & dust seals to all external doors, internal garage door and bar cabinets. Re: Things you forget - summary page 27 580Mar 06, 2013 11:45 am Thank you to everyone that has contributed to this thread- my husband and I used the summary during our discussions with the builder. A quick question though- when adding an additional drain hole in the laundry, was anyone told of different sizes that were available? We weren't advised of this. We attended the site at the request of the tiler and we noticed that the additional drain hole (which we paid extra for) was half the size of all the other drain holes. When questioned, the SS stated that 50mm is standard size. Which begs the question- why are the rest of the drain holes 100mm if 50mm is the standard size? Colour me confused. Depends what you're current inclusions are, but we're not including wardrobes and will just use second hand ones until we can save later on to get them built. Also have a… 3 11641 Looking to start the journey of becoming an owner builder in SA. Feeling pretty (overly) confident on the building and construction details, but really struggling to find… 0 8419 No. It's not original. Circa early to mid 90s would be my guess and maybe even as late as early 2000s 1 6632 |