Browse Forums Building A New House Re: Time frame after getting slab 5Dec 24, 2012 11:55 am Slab to lock-up for me was 30 days. They won't give me an estimated completion date, but the SS would only say "two-to-three months". However that said, my inspector has since found defects such that the house can't be considered to be at lock-up. Building a Delta 21 at Craigieburn - http://homeofzero.blogspot.com.au/ Deposit: 26/02. Contract: 22/05. Settlement: 29/05. Site start: 18/10. How much are you ahead in payments compared to where the build is at? Have you fully drawn down the loan? 5 12027 This is 100% true. You can not hang anything on steel frames. very frustrating 8 8076 The Soil classification has little to do with piers. The purpose of the classing of the soil is to identify the clay content and the "average expected range of movement… 2 9935 |