Browse Forums Building A New House Re: Got land need house to fit 475sqm, approx 16 w and 28 d 21Dec 10, 2012 9:52 pm Deposit Paid 31/10/12 Selections 25/1/13 NHC 28/2 DCA 20/3 Siteworks 2/5 Slabbed 20/5 Wall Frames 3/6 Brickwork Finished 2/7 Lock Up 19/7 viewtopic.php?f=31&t=58864 Re: Got land need house to fit 475sqm, approx 16 w and 28 d 22Dec 10, 2012 10:17 pm Kodiak Data Cabling onFaceBook Consult*, Design and Installation Data, TV, Home Theatre/ AV Cabling, Multi Room Audio, IP CCTV and Door Intercoms Ask for a Quote. *DIY DATA Cabling Is Ilegal Re: Got land need house to fit 475sqm, approx 16 w and 28 d 23Dec 11, 2012 11:28 am Initial Deposit 28/09/2012 // Prelim Contract Signed 25/11/2012 Selections 21/1/2013 to 23/1/2013 // Contract Signed 22/2/2013 Site Start 21/5/2013 // Slabbed 30/5/2013 Re: Got land need house to fit 475sqm, approx 16 w and 28 d 24Dec 11, 2012 11:28 am Initial Deposit 28/09/2012 // Prelim Contract Signed 25/11/2012 Selections 21/1/2013 to 23/1/2013 // Contract Signed 22/2/2013 Site Start 21/5/2013 // Slabbed 30/5/2013 Re: Got land need house to fit 475sqm, approx 16 w and 28 d 25Dec 11, 2012 9:13 pm Deposit Paid 31/10/12 Selections 25/1/13 NHC 28/2 DCA 20/3 Siteworks 2/5 Slabbed 20/5 Wall Frames 3/6 Brickwork Finished 2/7 Lock Up 19/7 viewtopic.php?f=31&t=58864 Re: Got land need house to fit 475sqm, approx 16 w and 28 d 26Dec 11, 2012 9:16 pm Deposit Paid 31/10/12 Selections 25/1/13 NHC 28/2 DCA 20/3 Siteworks 2/5 Slabbed 20/5 Wall Frames 3/6 Brickwork Finished 2/7 Lock Up 19/7 viewtopic.php?f=31&t=58864 Re: Got land need house to fit 475sqm, approx 16 w and 28 d 27Dec 12, 2012 6:59 am Nice That's how we wanted the en suite/robe but was gonna cost way too much! Where'd the rumpus room go haha Initial Deposit 28/09/2012 // Prelim Contract Signed 25/11/2012 Selections 21/1/2013 to 23/1/2013 // Contract Signed 22/2/2013 Site Start 21/5/2013 // Slabbed 30/5/2013 Re: Got land need house to fit 475sqm, approx 16 w and 28 d 28Dec 12, 2012 8:33 am Mia love the his and her wir, great idea. We have a higher ceiling in our entrance which was no issue with them so not sure if they would have an issue with dropping the height of a ceiling? Re: Got land need house to fit 475sqm, approx 16 w and 28 d 29Dec 12, 2012 10:52 pm Love the WIR's ours are similar! Considers the space you have in the ensuite have you considered a wall/door to close off the toilet? This could just be me. After ears of having only one toilet that was in the bathroom I am excited about toilets with doors! Re: Got land need house to fit 475sqm, approx 16 w and 28 d 30Dec 28, 2012 9:57 am fmac Love the WIR's ours are similar! Considers the space you have in the ensuite have you considered a wall/door to close off the toilet? This could just be me. After ears of having only one toilet that was in the bathroom I am excited about toilets with doors! Yeah plenty of space Fmac, just not sure what configuration of modules to fit after handover. At the moment Builder will install the token melamine shelf and hanging rail. For the nominal Credit of $132 to have it removed from the Contract it will stay initially while we decide plan of attack. We have a Cavity Slider to close off the Bathroom/WIR. Miss Mia is overjoyed with the concept of two bathrooms and has already set some ground rules Deposit Paid 31/10/12 Selections 25/1/13 NHC 28/2 DCA 20/3 Siteworks 2/5 Slabbed 20/5 Wall Frames 3/6 Brickwork Finished 2/7 Lock Up 19/7 viewtopic.php?f=31&t=58864 Re: Got land need house to fit 475sqm, approx 16 w and 28 d 31Dec 28, 2012 10:11 am I am also very excited about two bathrooms! We've had plans drawn up already for our WIR. It was only $1090 so paid our deposit and they'll sneak in and accurately measure before lockup so they are ready to install once we get keys! Very excited. Re: Got land need house to fit 475sqm, approx 16 w and 28 d 32Dec 28, 2012 10:22 am fmac I am also very excited about two bathrooms! We've had plans drawn up already for our WIR. It was only $1090 so paid our deposit and they'll sneak in and accurately measure before lockup so they are ready to install once we get keys! Very excited. Well played. Seems like you got a very competitive price from what our brief research has revealed. And to pro-actively take on the task is refreshing to see. Few we have spoken to lack interest in even quoting, no doubt because we are a fair way off 'handing over the $$$$' Will have to pop over visit your thread Deposit Paid 31/10/12 Selections 25/1/13 NHC 28/2 DCA 20/3 Siteworks 2/5 Slabbed 20/5 Wall Frames 3/6 Brickwork Finished 2/7 Lock Up 19/7 viewtopic.php?f=31&t=58864 Re: Got land need house to fit 475sqm, approx 16 w and 28 d 33Dec 28, 2012 3:01 pm I wanted an idea of cost before deleting the shelf and rail the builder includes. I was impressed with the company, he actually down sold us as we could add draws but after talking to him realized we didn't need them and saved $500! We don't even have council approval so was impressed they were happy for us to pay the deposit and lock in the price. So nice to find genuine service and pride in work still exists! Re: Got land need house to fit 475sqm, approx 16 w and 28 d 34Dec 28, 2012 5:13 pm fmac I wanted an idea of cost before deleting the shelf and rail the builder includes. I was impressed with the company, he actually down sold us as we could add draws but after talking to him realized we didn't need them and saved $500! We don't even have council approval so was impressed they were happy for us to pay the deposit and lock in the price. So nice to find genuine service and pride in work still exists! you able to point us in the direction of a drawing to get some idea? and only $132 credit that sucks haha Initial Deposit 28/09/2012 // Prelim Contract Signed 25/11/2012 Selections 21/1/2013 to 23/1/2013 // Contract Signed 22/2/2013 Site Start 21/5/2013 // Slabbed 30/5/2013 Re: Got land need house to fit 475sqm, approx 16 w and 28 d 35Dec 28, 2012 6:05 pm Re: Got land need house to fit 475sqm, approx 16 w and 28 d 36Jan 19, 2013 8:11 am Plans look GREAT!!!!! Cant wait to see it all come together!! Land Settled 2/11/11 Selections 24/9/12 Contract Signed 31/10/12 Site Works 17/1/13 SLABBED 29/2/13 Lock Up 11/4/13 PCI 22/5/13 Handover 3/6/13 http://w/w/w.project-buildahouse.blogspot.com Re: Got land need house to fit 475sqm, approx 16 w and 28 d 37Feb 05, 2013 5:53 pm Well selections are over (well in process of being signed off) and we are still talking albeit the tile selections made for an interesting experience.....application lodged with council and soon time to sit back and relax until we join the 'we've been slabbed community' We have come up with what will be a modern style that will bring earthy tones flowing through to the pool/alfresco area... Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Combination of a sleek gunmetal roof flowing through to the Browns....this flows through the internals with our Coffee Bamboo Floors offset by a Silk white kitchen and for a dash of vibrancy a nice but not in your face blue splashback Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Without going in to war and peace we are happy with the selections now to visit the upgrades...did have one win where we were originally quoted $198.00 for 8 x 500mm laminate shelves only to then see at the next draft a zero on the end to $1980 Happy to report that with a little prod the commitment at $198.00 was honoured, just got to be careful where the Builder may catch it up Deposit Paid 31/10/12 Selections 25/1/13 NHC 28/2 DCA 20/3 Siteworks 2/5 Slabbed 20/5 Wall Frames 3/6 Brickwork Finished 2/7 Lock Up 19/7 viewtopic.php?f=31&t=58864 Re: Got land need house to fit 475sqm, approx 16 w and 28 d 38Mar 02, 2013 7:13 am New Home Contract signed sealed and delivered, still more drawings to come and sign off though...when does it end. We were hoping we would be on site by NOW or early March however looks like now with private certifying and council Development Consent that is a month away and then 20days thereafter Builder goes to site. So mid - late April = late September finish on their proposed 22 week Build time. Only issue with that is Mr had the month of September off work which now has to change and may not be as easy as it sounds Either way near the home straight and the excitement is Building to soon see things start to rise from the ground..... Now to obtain the final quotes and do the bank valuation which in reading the forum results can vary in the current climate, not even our crystal ball can give us confidence how this chapter will unfold..... VERY EXCITING though Deposit Paid 31/10/12 Selections 25/1/13 NHC 28/2 DCA 20/3 Siteworks 2/5 Slabbed 20/5 Wall Frames 3/6 Brickwork Finished 2/7 Lock Up 19/7 viewtopic.php?f=31&t=58864 Re: Got land need house to fit 475sqm, approx 16 w and 28 d 39Mar 15, 2013 7:27 pm YAY!! That is exciting and great to see the progress! Selections look great as well! Glad to see it all coming together and really April will be here before you know it! Land Settled 2/11/11 Selections 24/9/12 Contract Signed 31/10/12 Site Works 17/1/13 SLABBED 29/2/13 Lock Up 11/4/13 PCI 22/5/13 Handover 3/6/13 http://w/w/w.project-buildahouse.blogspot.com Re: Got land need house to fit 475sqm, approx 16 w and 28 d 40Mar 24, 2013 3:46 pm Hi Miss Mia, just found your thread. We're building in Charles Sturt area too. Your plans and colours look great. Red_Jezzabelle, what brick is that on your blog? The OP has gone The latch and striker are definitely not aligned but there was no point trying to help the OP understand that. Hence the reason they are no longer with us. 12 6169 We hired Darbecca to do every stage inspection, and I strongly recommend them to anyone that asks me. They were amazing. Thorough reports with photos at every stage,… 6 7705 i would not be signing anything on the day read your contract about when builder submits final invoice generally, have to meet builder within 7 days of receiving final… 1 5350 |