Browse Forums Building A New House Re: Porter Davis homes 6149Sep 25, 2012 1:23 pm Building the Montague 21 by Porter Davis at The Estuary, Leopold. Our Blog: http://porterdavismontague21.blogspot.com.au/ Re: Porter Davis homes 6155Sep 26, 2012 8:41 am cinderella_375 Frustrating! Day 5 of nice weather after slab pour and NOTHING has happened.... How often did u guys actually hear from your SS with updates? The slab takes 28 day to reach 99% of its structual strength. take it as a good thing that PD are taking time to build the frame. Re: Porter Davis homes 6156Sep 26, 2012 10:26 am Hi All. Did anyone on here get 300x600 porcelain matte finish tiles and have issues cleaning initially? What do you recommend using to get a nice finish? Cheers Re: Porter Davis homes 6157Sep 26, 2012 3:21 pm Doreen_Kallara33 Hi All. Did anyone on here get 300x600 porcelain matte finish tiles and have issues cleaning initially? What do you recommend using to get a nice finish? Cheers Hi Doreen_Kallara33 I'm concerned if you are still having problems with your tile cleaning as I had responded to your previous post on this issue on August 27. At that time, I sent you a link (below) to an overall guide on how to look after porcelain tiles from Lithofin, the supplier of tile care products recommended by National Tiles. If following the recommendations outlined in this link are not giving you the desired result, please feel free to send me a private message and I will look further into this matter for you. Cheers Helen http://tools.cdkstone.com.au/index.cfm/page/productdetail/id/678/FZ-INFO Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 6158Sep 26, 2012 11:35 pm just updated ourhttp://sandringham45.blogspot.com.au frames have almost been completed! we made a dear error in our colour selections. Does anyone know if we can even have the slightest chance of changing it now that we're in construction stage? For some odd reason, our colour coordinator didn't note down in his selections that we want our garage door pale WHITE. He instead had it down as the same as our downpipes, some faded BROWN colour (colourbond dune). Our BC says that theres NO way possible that we can get this sorted out since we're at construction already. If theres no way then it looks like we'll have to do a paint over the door after hand over. Im thinking something like this: http://www.bnd.com.au/timber-coat/ I can't believe we mange to miss it...but i guess when you're building a house, theres always a chance for an error. PLEASE advise!! Re: Porter Davis homes 6159Sep 26, 2012 11:41 pm gabster just updated ourhttp://sandringham45.blogspot.com.au frames have almost been completed! we made a dear error in our colour selections. Does anyone know if we can even have the slightest chance of changing it now that we're in construction stage? For some odd reason, our colour coordinator didn't note down in his selections that we want our garage door pale WHITE. He instead had it down as the same as our downpipes, some faded BROWN colour (colourbond dune). Our BC says that theres NO way possible that we can get this sorted out since we're at construction already. If theres no way then it looks like we'll have to do a paint over the door after hand over. Im thinking something like this: http://www.bnd.com.au/timber-coat/ I can't believe we mange to miss it...but i guess when you're building a house, theres always a chance for an error. PLEASE advise!! Force teh issue, they would not have ordered your door yet, not 4+ months out. PCV. Re: Porter Davis homes 6160Sep 26, 2012 11:45 pm humble gabster just updated ourhttp://sandringham45.blogspot.com.au frames have almost been completed! we made a dear error in our colour selections. Does anyone know if we can even have the slightest chance of changing it now that we're in construction stage? For some odd reason, our colour coordinator didn't note down in his selections that we want our garage door pale WHITE. He instead had it down as the same as our downpipes, some faded BROWN colour (colourbond dune). Our BC says that theres NO way possible that we can get this sorted out since we're at construction already. If theres no way then it looks like we'll have to do a paint over the door after hand over. Im thinking something like this: http://www.bnd.com.au/timber-coat/ I can't believe we mange to miss it...but i guess when you're building a house, theres always a chance for an error. PLEASE advise!! Force teh issue, they would not have ordered your door yet, not 4+ months out. PCV. Are you speaking from experience humble? Would I just ask them again? haha! I don't want to seem like a pain in the butt to them... but then again, it could save me $$$ !! Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report 3 12182 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 74219 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 105129 |