Browse Forums Building A New House Re: Building the Santorini MK 2 by Masterton Homes 7May 10, 2012 12:04 pm For info on our build: viewtopic.php?f=31&t=43093 Built the McLaren by Dechellis - slab down 22 Feb - handover 30 Aug 2011 - and gardens finished 9 Dec 2012!! Re: Building the Santorini MK 2 by Masterton Homes 19Jun 21, 2012 5:35 pm For info on our build: viewtopic.php?f=31&t=43093 Built the McLaren by Dechellis - slab down 22 Feb - handover 30 Aug 2011 - and gardens finished 9 Dec 2012!! Re: Building the Santorini MK 2 by Masterton Homes 20Jun 29, 2012 10:37 am Looks like a bit of planning and work ahead of us, as we decide on internal colours and any upgrades. Then, upstairs laminate timber flooring, Air-con, electrical & alarm. I have a valuable check-list from this forum to guide us during this planning period. So a BIG thank you to all contributions and ideas. Your "Hydraulics" would most likely relate to Clause 5.6 of AS/NZS 3500.2 Stable / Unstable Soils & AS2870 Clause 5.6.3 Drainage requirements. 5.6 states a site that has… 1 335 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 47657 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 73958 |