Browse Forums Building A New House Re: Porter Davis homes 4945Mar 26, 2012 9:12 am Forrestdale 27 Land Titled:4/11/11 Building Permit:4/11/11 Site Start Date: 16/11/11 Slab Date: 01/12/11 Frame Date:05/12/11 http://hordefamilyhome.blogspot.com/ Re: Porter Davis homes 4946Mar 26, 2012 9:24 am Cheers, Alpal Building PD Heathmont 40 BLOG: http://alpal-pd-heathmont40.blogspot.com/ Deposit paid 19/08/2011 Contract signing 3/10/2011 Site Start 10/11/2011 Slab 23/11/2011 Re: Porter Davis homes 4947Mar 26, 2012 9:51 am Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 4949Mar 26, 2012 10:04 am Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Porter Davis homes 4950Mar 26, 2012 1:45 pm Building the Drysdale 30 Wallara Waters, Wallan My Blog : http://www.ourwallanhome.blogspot.com My thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=50975 Re: Porter Davis homes 4951Mar 26, 2012 4:56 pm Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 4957Mar 27, 2012 12:52 pm Zinner tstr1a Hi Zinner, lock up to fixing took 2 weeks Fixing to handoover took 9 weeks. Thanks for the info tstr1a. ...now I can officially begin my uncontrolled sobbing... find out the reason, it doesn't sound right.. best of luck Re: Porter Davis homes 4958Mar 27, 2012 1:22 pm tstr1a Zinner tstr1a Hi Zinner, lock up to fixing took 2 weeks Fixing to handoover took 9 weeks. Thanks for the info tstr1a. ...now I can officially begin my uncontrolled sobbing... find out the reason, it doesn't sound right.. best of luck Based on your times and assuming that fixing will be completed this week, my Fixing to handover should be about ... 72 WEEKS! lol Re: Porter Davis homes 4959Mar 27, 2012 1:27 pm cattycatcat - from what i could see i didn't see any tiles on site-but they maybe inside somewhere out of site???? They said they would contact us to meet them on site to verify they are the correct tiles and to go voer any specific deisgns we want with our tiles- i.e strip in shower and behind the sinks. We are hoping to be in our place in 4 weeks.... Forrestdale 27 Land Titled:4/11/11 Building Permit:4/11/11 Site Start Date: 16/11/11 Slab Date: 01/12/11 Frame Date:05/12/11 http://hordefamilyhome.blogspot.com/ Re: Porter Davis homes 4960Mar 27, 2012 3:51 pm Not sounding good Zinner, hopefully just a lack of tradies rather than a problem. How good is your SS? Have updated my thread with pics of our place without scaffolding. Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report 3 12320 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 74688 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 105481 |