Browse Forums Building A New House Re: Porter Davis homes 4945Mar 26, 2012 9:12 am Forrestdale 27 Land Titled:4/11/11 Building Permit:4/11/11 Site Start Date: 16/11/11 Slab Date: 01/12/11 Frame Date:05/12/11 http://hordefamilyhome.blogspot.com/ Re: Porter Davis homes 4946Mar 26, 2012 9:24 am Cheers, Alpal Building PD Heathmont 40 BLOG: http://alpal-pd-heathmont40.blogspot.com/ Deposit paid 19/08/2011 Contract signing 3/10/2011 Site Start 10/11/2011 Slab 23/11/2011 Re: Porter Davis homes 4947Mar 26, 2012 9:51 am Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 4949Mar 26, 2012 10:04 am Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Porter Davis homes 4950Mar 26, 2012 1:45 pm Sammyjane31 cattycatcat thebigbuild We have news; PCI booked for April 10!! CONGRATS!!!!! Ours is booked for the 12th of April With hand over scheduled for the 19th if all goes to plan... Awesome news! Cant wait for pictures:) We went by our place on the weekend and painting has been finsihed and tile should be this week. Not holding my breath.lol How long did it take onc e tiling started before they said when PCI or handover is??? Have your tiles been delivered ready to go? It took 2 days after they were on site for the laying to start. Our tiles started on 6/3/12 and they gave us a PCI date on friday so it took about 2-3 weeks Sent from my iPhone so please excuse my spelling mist cakes Building the Drysdale 30 Wallara Waters, Wallan My Blog : http://www.ourwallanhome.blogspot.com My thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=50975 Re: Porter Davis homes 4951Mar 26, 2012 4:56 pm Run to Taylors Hill this Saturday! Hi H1, I'm excited to let you all know that this Saturday 31 March, we are opening a brand new Access display centre at Taylors Hill! Come and explore two must-see homes from our Access range and walk straight into the latest interior styles and inspiring layouts with the new London design, as well as the incredibly popular Montague. The London design incorporates a family room and additional rumpus on top of the kitchen and dining areas to service first and new home buyers who want the space and room to grow. The London also comes with a myriad of options for those who want to scale up the size to suit their needs, including an alfresco, grand alfresco, grand family room, iHub, soaker tub and more. The Montague is simply stunning with the French Champagne inspired theme and it showcases a variety of structural options, with a living and iHub zone, extended kitchen and grand alfresco area, all in addition to the standard four bedrooms and two bathrooms and all of which fits on a more affordable 14 metre wide lot. There is so much discover at Taylors Hill so ensure you plan a visit to our new home this weekend. Details: Taylors Hill, Subiaco Way, Taylors Hill 3037. Melway Ref: 356 F6. Open 6 days Sat-Thurs 11am til 5pm For further information visit: http://www.porterdavis.com.au/#/displaylocationview/taylors_hill_a If you visit the display be sure to let us know what you think! Cheers, Ebony Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 4952Mar 26, 2012 5:14 pm Team PD J & C Rups We paid $7,152 to go to cat 3 on a prestige 33 square single storey. I think cat 4 would be around 10k. Thanks Rups...this I'm assuming is for "Traditional Cat 4" roof tiles. I have been asking these questions as we have a new BC, who is yet to contact us, Its more than 3 weeks and no call as yet, I might have to introduce myself. Hi J & C, I’m sorry to hear your new BC hasn’t been in contact with you yet, or hasn't been able to answer these questions for you. If you would like me to follow this up on your behalf please send me a private message with your full name, lot address and contact number. Regards, Ebony Thanks Ebony, we 2-3 weeks before our titles are in, I will send you our the details if she does not get in touch with us by then. Our BC informed us that she is new to the organisation so might need some time to get acclimatised. Re: Porter Davis homes 4954Mar 27, 2012 12:22 pm Wateman What would be the average length of time to get to PCI once fixing is complete? I know most of you are building/have built big houses, and ours is only small, but I was just curious. Ours seems to be flying along so far, we will be at week 9 next Wednesday and fixing was complete last Wednesday (29th). I have a similar question about the fixing stage. How long did it take for most peoples fixing stage to be complete. (i.e. from Lockup to fixing) My build was at Lockup in week 14. It is now week 30 and my fixing stage is still not complete. So that is 14 weeks to Lockup and 16 weeks in fixing stage and still the fixing stage is not complete. The fixing stage has gone for longer than all previous stages combined. From this I can only ascertain 1 to 3 things (one or all 3 must be true) 1. My Lockup invoice was given out to early. 2. There is something badly wrong with my build that is holding up fixing that I have not been told about. 3. PD no longer cares about my build. (4. Somehow my house has been confused with someone who is building on the moon and not in the SE suburbs of Melbourne - ah-la the lack of tradesmen working on my build) Re: Porter Davis homes 4955Mar 27, 2012 12:33 pm Zinner Wateman What would be the average length of time to get to PCI once fixing is complete? I know most of you are building/have built big houses, and ours is only small, but I was just curious. Ours seems to be flying along so far, we will be at week 9 next Wednesday and fixing was complete last Wednesday (29th). I have a similar question about the fixing stage. How long did it take for most peoples fixing stage to be complete. (i.e. from Lockup to fixing) My build was at Lockup in week 14. It is now week 30 and my fixing stage is still not complete. So that is 14 weeks to Lockup and 16 weeks in fixing stage and still the fixing stage is not complete. The fixing stage has gone for longer than all previous stages combined. From this I can only ascertain 1 to 3 things (one or all 3 must be true) 1. My Lockup invoice was given out to early. 2. There is something badly wrong with my build that is holding up fixing that I have not been told about. 3. PD no longer cares about my build. (4. Somehow my house has been confused with someone who is building on the moon and not in the SE suburbs of Melbourne - ah-la the lack of tradesmen working on my build) Hi Zinner, lock up to fixing took 2 weeks Fixing to handoover took 9 weeks. Re: Porter Davis homes 4957Mar 27, 2012 12:52 pm Zinner tstr1a Hi Zinner, lock up to fixing took 2 weeks Fixing to handoover took 9 weeks. Thanks for the info tstr1a. ...now I can officially begin my uncontrolled sobbing... find out the reason, it doesn't sound right.. best of luck Re: Porter Davis homes 4958Mar 27, 2012 1:22 pm tstr1a Zinner tstr1a Hi Zinner, lock up to fixing took 2 weeks Fixing to handoover took 9 weeks. Thanks for the info tstr1a. ...now I can officially begin my uncontrolled sobbing... find out the reason, it doesn't sound right.. best of luck Based on your times and assuming that fixing will be completed this week, my Fixing to handover should be about ... 72 WEEKS! lol Re: Porter Davis homes 4959Mar 27, 2012 1:27 pm cattycatcat - from what i could see i didn't see any tiles on site-but they maybe inside somewhere out of site???? They said they would contact us to meet them on site to verify they are the correct tiles and to go voer any specific deisgns we want with our tiles- i.e strip in shower and behind the sinks. We are hoping to be in our place in 4 weeks.... Forrestdale 27 Land Titled:4/11/11 Building Permit:4/11/11 Site Start Date: 16/11/11 Slab Date: 01/12/11 Frame Date:05/12/11 http://hordefamilyhome.blogspot.com/ Re: Porter Davis homes 4960Mar 27, 2012 3:51 pm Not sounding good Zinner, hopefully just a lack of tradies rather than a problem. How good is your SS? Have updated my thread with pics of our place without scaffolding. Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report 3 12954 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 76106 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 106772 |