Browse Forums Building A New House Re: Porter Davis homes 4550Feb 13, 2012 11:06 pm Cheers, Alpal Building PD Heathmont 40 BLOG: http://alpal-pd-heathmont40.blogspot.com/ Deposit paid 19/08/2011 Contract signing 3/10/2011 Site Start 10/11/2011 Slab 23/11/2011 Re: Porter Davis homes 4552Feb 14, 2012 8:47 am Forrestdale 27 Land Titled:4/11/11 Building Permit:4/11/11 Site Start Date: 16/11/11 Slab Date: 01/12/11 Frame Date:05/12/11 http://hordefamilyhome.blogspot.com/ Re: Porter Davis homes 4553Feb 14, 2012 9:09 am Cheers, Alpal Building PD Heathmont 40 BLOG: http://alpal-pd-heathmont40.blogspot.com/ Deposit paid 19/08/2011 Contract signing 3/10/2011 Site Start 10/11/2011 Slab 23/11/2011 Re: Porter Davis homes 4554Feb 14, 2012 10:19 am Sammyjane31 Great news Alpal and Rups! Rups your tradies would definitely be happy campers! It's a great idea and gesture:) Unfortunately the time i get down there it's a ghost town! I am looking forward to looking at both your blogs! We went by our place on Saturday looked fantastic we have cabinets in the kictehn,bathrooms and laundry and we are really happy with our colour choices! One bad thing we run over a tape of screws and had to change our type which is now at the shop wither being fixed or replaced- but most likely replaced at there where 4 screws! We wont be parking in front of our house again! lol Hi Sammyjane31, Oh no, I’m sorry to hear about your tyre, that’s a bit of bad luck. I look forward to seeing some pics of your newly installed cabinets, the photos from your last blog post to now will really showcase the progress. Cheers, Ebony Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 4555Feb 14, 2012 1:53 pm Hi Everyone, If anyone is interested I have updated our blog with render and cabinet pictures. Forrestdale 27 Land Titled:4/11/11 Building Permit:4/11/11 Site Start Date: 16/11/11 Slab Date: 01/12/11 Frame Date:05/12/11 http://hordefamilyhome.blogspot.com/ Re: Porter Davis homes 4556Feb 14, 2012 3:29 pm PD has just sent me a lock up invoice... Considering the doors are installed and no locks put on how is this lockup? Cheeky... Cheers, Alpal Building PD Heathmont 40 BLOG: http://alpal-pd-heathmont40.blogspot.com/ Deposit paid 19/08/2011 Contract signing 3/10/2011 Site Start 10/11/2011 Slab 23/11/2011 Porter Davis homes 4559Feb 14, 2012 9:07 pm Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Maybe another silly question (I'm good at these) but are these gaps in the bricks normal? Both the long full length gap on the left in line with the windows and the small gap every 3 bricks along the bottom? I have noticed it in some houses around the estate especially PD ones but not all. Porter Davis homes 4560Feb 14, 2012 9:26 pm The long gap is an expansion joint, your house would destroy itself over the course of a year without them, you should have a few all up. There will be a caulking compound put on there in due course to fill it. The small holes are called weep holes, again they are there for a purpose. Mainly for when your house is sad........ Seriously, they serve to allow the air in the wall space to breathe in effect, drains condensation I think. Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report 3 12582 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 75201 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 106073 |