Browse Forums Building A New House Re: Porter Davis homes 4402Jan 26, 2012 10:30 pm nasi_goreng Building Moreland 27 with Porter Davis Access Range in the western 'burbs of Melbourne blog: http://papertobrick.blogspot.com "Building a house makes you manic-depressive" Re: Porter Davis homes 4403Jan 26, 2012 11:27 pm Ivanhoe 36 Dep:18-4-11 Tender:26-5-11 Colour/Electrical:8-6-11 Contract:29-6-11 Building Permit:6-7-11 Site Start:16-8-11 PCI:10-1-12 Handover:24-1-12 http://eli-kay-ivanhoe36.blogspot.com/ Porter Davis homes 4411Jan 28, 2012 4:47 pm nasi_goreng Building Moreland 27 with Porter Davis Access Range in the western 'burbs of Melbourne blog: http://papertobrick.blogspot.com "Building a house makes you manic-depressive" Re: Porter Davis homes 4414Jan 29, 2012 9:16 am Forrestdale 27 Land Titled:4/11/11 Building Permit:4/11/11 Site Start Date: 16/11/11 Slab Date: 01/12/11 Frame Date:05/12/11 http://hordefamilyhome.blogspot.com/ Re: Porter Davis homes 4415Jan 29, 2012 4:29 pm Sammyjane31 As of Wednesday we are at lock up (without door locks and handles)and on Saturday saw the guys do the plaster on the ceiling and walls and should be finished on Monday. Great news SJ31 - your build is going really quick... I have just posted an update on my blog, ours has been slow the last week while we await the scaffolding tomorrow. In the meantime I have drawn up a rough landscaping plan for after handover. Quick question to this forum - anyone contracted someone to do sleeper retaining walls. Need to get an idea of costs. Cheers, Alpal Building PD Heathmont 40 BLOG: http://alpal-pd-heathmont40.blogspot.com/ Deposit paid 19/08/2011 Contract signing 3/10/2011 Site Start 10/11/2011 Slab 23/11/2011 Re: Porter Davis homes 4416Jan 29, 2012 6:49 pm Looks great Alpal! Your brickies will be back to work on the 2nd storey in no time! Your facade looks absolutely amazing! We are thinking crushed rocks on both sides of our house too, but grass will on one side of the front yard (corner side of the block) as the driveway sits on our property line on the other. Our patio is on the side so we are thinking decking right outside the patio but will be looking at eco decking which is made up of recycled plastic and wood so you never have to sand it and re coat it.Probably more expensive but alot cheaper in the long run. We will also be doing the work ourselves probably next summer.lol Forrestdale 27 Land Titled:4/11/11 Building Permit:4/11/11 Site Start Date: 16/11/11 Slab Date: 01/12/11 Frame Date:05/12/11 http://hordefamilyhome.blogspot.com/ Re: Porter Davis homes 4417Jan 30, 2012 9:57 am Sammyjane31 Looks great Alpal! Your brickies will be back to work on the 2nd storey in no time! Your facade looks absolutely amazing! We are thinking crushed rocks on both sides of our house too, but grass will on one side of the front yard (corner side of the block) as the driveway sits on our property line on the other. Our patio is on the side so we are thinking decking right outside the patio but will be looking at eco decking which is made up of recycled plastic and wood so you never have to sand it and re coat it.Probably more expensive but alot cheaper in the long run. We will also be doing the work ourselves probably next summer.lol SJ31 - Sounds like you have quite a bit of work ahead of you as well. I would have loved to do concrete or paving down the sides but that would have costed a fortune - might have to wait a couple of years before doing that. Thats a great idea about using the eco deck - is it much more expensive then normal decking wood? Might have to look seriously into this as I am dreading having to restain decking every 6-12 months. Cheers, Alpal Building PD Heathmont 40 BLOG: http://alpal-pd-heathmont40.blogspot.com/ Deposit paid 19/08/2011 Contract signing 3/10/2011 Site Start 10/11/2011 Slab 23/11/2011 Re: Porter Davis homes 4418Jan 30, 2012 10:01 am Sammyjane31 As of Wednesday we are at lock up (without door locks and handles)and on Saturday saw the guys do the plaster on the ceiling and walls and should be finished on Monday. Hi Sammyjane31, Your build is moving quick, that’s exciting news. I’m looking forward to seeing some new pictures. Cheers, Ebony Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 4419Jan 30, 2012 9:00 pm SCAFFOLDING is now up.. I know its not really a highlight but my site has been sitting over a week waiting for this... Should see some good progress now... To save everyone going through the thousands of forums and blogs, I propose everyone provides a 2 line update on their jobs on Sunday or Mondays.... Whats everyones thoughts on this? Just an idea... Cheers, Alpal Building PD Heathmont 40 BLOG: http://alpal-pd-heathmont40.blogspot.com/ Deposit paid 19/08/2011 Contract signing 3/10/2011 Site Start 10/11/2011 Slab 23/11/2011 Porter Davis homes 4420Jan 30, 2012 9:10 pm Alpal To save everyone going through the thousands of forums and blogs, I propose everyone provides a 2 line update on their jobs on Sunday or Mondays.... Whats everyones thoughts on this? Just an idea... Sounds good! Our frame is complete I think.. Roof is on looks done, guess I'll know when we get an invoice! Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report 3 12182 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 74220 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 105134 |