Browse Forums Building A New House Re: Porter Davis homes 4321Jan 19, 2012 2:08 pm Forrestdale 27 Land Titled:4/11/11 Building Permit:4/11/11 Site Start Date: 16/11/11 Slab Date: 01/12/11 Frame Date:05/12/11 http://hordefamilyhome.blogspot.com/ Re: Porter Davis homes 4322Jan 19, 2012 2:13 pm Forrestdale 27 Land Titled:4/11/11 Building Permit:4/11/11 Site Start Date: 16/11/11 Slab Date: 01/12/11 Frame Date:05/12/11 http://hordefamilyhome.blogspot.com/ Re: Porter Davis homes 4331Jan 20, 2012 10:18 am Forrestdale 27 Land Titled:4/11/11 Building Permit:4/11/11 Site Start Date: 16/11/11 Slab Date: 01/12/11 Frame Date:05/12/11 http://hordefamilyhome.blogspot.com/ Re: Porter Davis homes 4332Jan 20, 2012 10:22 am Forrestdale 27 Land Titled:4/11/11 Building Permit:4/11/11 Site Start Date: 16/11/11 Slab Date: 01/12/11 Frame Date:05/12/11 http://hordefamilyhome.blogspot.com/ Re: Porter Davis homes 4334Jan 20, 2012 11:55 am Forrestdale 27 Land Titled:4/11/11 Building Permit:4/11/11 Site Start Date: 16/11/11 Slab Date: 01/12/11 Frame Date:05/12/11 http://hordefamilyhome.blogspot.com/ Re: Porter Davis homes 4335Jan 20, 2012 12:09 pm Sammyjane31 tstrla just checked your blog you did a lot of elctrical-was it expensive? We had PD add the wiring for lights in the backyard, wiring to front of house which we will need an electriction to install post handover. How much did you get the LED lights for?? i have heard they are cheaper post handover? We are considering them as they are cheaper to run and dont have the delay that the CFL's have electrical was very expensive $9k (includes, alarm, data point, media room cabling and post handover work) PD's prices are over the top and I had stuff done post handover. With LED get them to install GU-10 fittings as they take both CPL and LED downlight. We have a mixture of CFL's and LED's up stairs. Downstair I installed halogens as they produce the best light (especially for the kitchen). We mainly us lamps downstairs with CFL light bulbs and the light is more soft and diffused. Re: Porter Davis homes 4336Jan 20, 2012 12:45 pm WPW $9k-but your house is also prbably twice the size as our house and we didnt do cabling for media room as we are going to use a wireless surround sound system. Thanks for the info re: GU-10's! We aren't sure where we will need extra light most likely the kichen area but arent sure about anywhere else and we will also have lamps too - already have them from previous. Forrestdale 27 Land Titled:4/11/11 Building Permit:4/11/11 Site Start Date: 16/11/11 Slab Date: 01/12/11 Frame Date:05/12/11 http://hordefamilyhome.blogspot.com/ Re: Porter Davis homes 4340Jan 20, 2012 1:48 pm Just terrible Humble! I hate to say it but i was thinking workmen in the area as they would see every movement I hope nothing of special meaning or of value was taken! Hang in there and i am glad you are still on here if i have any questions Forrestdale 27 Land Titled:4/11/11 Building Permit:4/11/11 Site Start Date: 16/11/11 Slab Date: 01/12/11 Frame Date:05/12/11 http://hordefamilyhome.blogspot.com/ Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report 3 12182 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 74219 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 105129 |