Browse Forums Building A New House Re: Building Carlisle Atlantique 36 - Frame. 21Nov 26, 2011 8:12 pm Our building thread: viewtopic.php?f=31&t=51657 Re: Building Carlisle Atlantique 36 - Frame. 22Dec 03, 2011 10:17 am Built Carlisle Atlantique 36 Our build thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=50256 Re: Building Carlisle Atlantique 36 - Frame. 23Dec 03, 2011 9:06 pm Our building thread: viewtopic.php?f=31&t=51657 Re: Building Carlisle Atlantique 36 - Frame. 24Dec 04, 2011 10:35 pm hubby, kids and me all waiting for the Amberlea Site Cut 27 September 2011 https://forum.homeone.com.au/viewtopic.php?f=31&t=46637 http://www.dscml.com/ Re: Building Carlisle Atlantique 36 - Frame. 25Dec 05, 2011 7:54 pm Built Carlisle Atlantique 36 Our build thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=50256 Re: Building Carlisle Atlantique 36 - Frame. 26Dec 06, 2011 5:41 am Our building thread: viewtopic.php?f=31&t=51657 Re: Building Carlisle Atlantique 36 - Plastered. 28Dec 17, 2011 1:48 pm Built Carlisle Atlantique 36 Our build thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=50256 Re: Building Carlisle Atlantique 36 - Kitchen Cabinets. 29Dec 17, 2011 2:26 pm Our building thread: viewtopic.php?f=31&t=51657 Re: Building Carlisle Atlantique 36 - Kitchen Cabinets. 30Dec 17, 2011 10:02 pm 26/2 - Sales 23/3 - Colours 31/3 - Tender 14/4 - Contract 7/5 - Taps 12/6 - Site start 15/6 - Slab 27/6 - Frame 1/8 - Lockup/Fixing 29/9 - PCI 25/10 - Handover Re: Building Carlisle Atlantique 36 - Kitchen Cabinets. 32Dec 22, 2011 11:17 am Built Carlisle Atlantique 36 Our build thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=50256 Re: Building Carlisle Atlantique 36 - Internal Doors Too Dar 34Dec 22, 2011 1:55 pm hubby, kids and me all waiting for the Amberlea Site Cut 27 September 2011 https://forum.homeone.com.au/viewtopic.php?f=31&t=46637 http://www.dscml.com/ Re: Building Carlisle Atlantique 36 - Frame. 37Dec 27, 2011 5:54 pm Living in Sydney - Building in Melbourne My Thread: viewtopic.php?f=31&t=50518 Re: Building Carlisle Atlantique 36 - Internal Doors Too Dar 38Dec 27, 2011 5:59 pm Living in Sydney - Building in Melbourne My Thread: viewtopic.php?f=31&t=50518 Re: Building Carlisle Atlantique 36 - Internal Doors Too Dar 39Jan 12, 2012 4:07 pm Blog: http://matt-and-jo.blogspot.com.au/ Purchased Block: August 2011, Block Settled: Dec, 2011 Contract Signed: 28/6/12, Site Works Started: 9/11/12 Re: Building Carlisle Atlantique 36 - Internal Doors Too Dar 40Jan 13, 2012 5:32 pm Thanks for all your comments. The build has been racing along, so finally time for some more pics! Most of the electrical is finished - we can turn the lights on! And the tiling has started - most of the tiles are laid, but not grouted yet. Matt+Jo - A Butlers Pantry was on our essentials list, so when Carlisle showed us what they could do with this plan, it was the clincher. Very happy with the size of it, it's huge. And since you asked, here's more pics. The powder room. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Ensuite Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Ensuite vanities. I couldn't walk on the newly laid tiles, so had to shoot around the corner Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Laundry Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Home Theatre Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Kids bathroom - better shot of the floor tiles that are same as ensuite. I love the tiled shower waste outlet. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Looking from beside kitchen to front entry. Laundry door on the right is in the darker colour as mentioned earlier. We're actually not minding it. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Main bedroom doors from inside the room, again in the darker colour. Entrance to the WIR to the left. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Side showing brick colour. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Front facade. Wondering whether to bring this up with our SS. Unless they plan on putting up more sheeting across the large brickwork area, the facade doesn't match the plan. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ I'll post the facade as on the plan. This is as it's shown on the front elevation in the actual construction drawings as well. It's says lightweight cladding over. Perhaps they just haven't finished putting the cladding on? It kinda looks like they've finished though. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ You can see the rendered part that will be a strawberry colour should extend over the face of the brickwork, but it's not looking like that at the moment. I'll let you know what the SS says. Michael Built Carlisle Atlantique 36 Our build thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=50256 Carlisle use to sneak a water resistant "Performance Solution" into their contracts. Have you checked your contract for same? 4 10599 We were lucky in that our old house was so small (86 square metres) compared to the new house, they were able to take enough readings around the old backyard house before… 8 37981 |