Nice one!! Strangely exciting, isn't it?
Browse Forums Building A New House Re: Porter Davis homes 3906Dec 05, 2011 9:33 am Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 3907Dec 05, 2011 9:43 am Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 3908Dec 05, 2011 1:55 pm Ivanhoe 36 Dep:18-4-11 Tender:26-5-11 Colour/Electrical:8-6-11 Contract:29-6-11 Building Permit:6-7-11 Site Start:16-8-11 PCI:10-1-12 Handover:24-1-12 http://eli-kay-ivanhoe36.blogspot.com/ Re: Porter Davis homes 3910Dec 05, 2011 4:49 pm Wow Tstr1a your place is really nearly done It looks great and I love the terrace with the Waldorf, we nearly chose it ourselves so I'm very jealous I'm keen to wallpaper some feature walls as well but will try and rope my Uncle into installing to save some $. Wateman, Congrats on the tap....the little things that show all the effort of the last months are the most exciting As for us, drove past 3 times today just because I can and they laid our pipes today, still trying to figure out which pipe is which but I figure the 7 men on site couldn't all muck it up Re: Porter Davis homes 3911Dec 05, 2011 4:52 pm JLD Wow Tstr1a your place is really nearly done It looks great and I love the terrace with the Waldorf, we nearly chose it ourselves so I'm very jealous I'm keen to wallpaper some feature walls as well but will try and rope my Uncle into installing to save some $. Wateman, Congrats on the tap....the little things that show all the effort of the last months are the most exciting As for us, drove past 3 times today just because I can and they laid our pipes today, still trying to figure out which pipe is which but I figure the 7 men on site couldn't all muck it up Thanks JLD, best of luck with ur build as well. Do u think a frame will be up before xmas? Re: Porter Davis homes 3912Dec 05, 2011 5:02 pm tstr1a JLD Wow Tstr1a your place is really nearly done It looks great and I love the terrace with the Waldorf, we nearly chose it ourselves so I'm very jealous I'm keen to wallpaper some feature walls as well but will try and rope my Uncle into installing to save some $. Wateman, Congrats on the tap....the little things that show all the effort of the last months are the most exciting As for us, drove past 3 times today just because I can and they laid our pipes today, still trying to figure out which pipe is which but I figure the 7 men on site couldn't all muck it up Thanks JLD, best of luck with ur build as well. Do u think a frame will be up before xmas? Thanks Nope I don't think we'll have frames as our slab pour is the 19th, gives it a chances to dry so no drama. We always knew they'd stop for Christmas so not worried at which point that is. Re: Porter Davis homes 3913Dec 06, 2011 9:08 am tstr1a I've updated my blog wih more pics Hi tstr1a, I love your blog post! I’m glad you’ve been able to settle your worries about carpet, and it’s funny you’ve mentioned about pricing at Hopetoun, there is a changing coming soon – watch this space! Good luck with your search for wall paper. Cheers, Ebony Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 3914Dec 06, 2011 9:25 am Team PD tstr1a I've updated my blog wih more pics Hi tstr1a, I love your blog post! I’m glad you’ve been able to settle your worries about carpet, and it’s funny you’ve mentioned about pricing at Hopetoun, there is a changing coming soon – watch this space! Good luck with your search for wall paper. Cheers, Ebony That’s good news about changes Ebony. Customers enter in to a building contract with mixed emotions and fear of the unknown, transparent prices will help customers work out their budgets and BC’s won’t spend half their time answering pricing queries. Re: Porter Davis homes 3915Dec 06, 2011 10:08 am Team PD tstr1a I've updated my blog wih more pics Hi tstr1a, I love your blog post! I’m glad you’ve been able to settle your worries about carpet, and it’s funny you’ve mentioned about pricing at Hopetoun, there is a changing coming soon – watch this space! Good luck with your search for wall paper. Cheers, Ebony Ebony, if there is one thing that can be fixed its the process of picking stuff @ hopetoun, while we all understand that prices change, it needs to be clear what the price is. The floorplans are standard things, just give everyone the pricelist as of x date for the floorplan they have chosen. The BC people must hate the tender/contract process, as one can only assume this is where the debates occur. Meeting SS onsite on Friday, we should have carpet on Thursday. Re: Porter Davis homes 3916Dec 06, 2011 11:20 am Slab has been poured...!!! Can't wait to go and see it tonight!! Clock's ticking for the invoice to land Re: Porter Davis homes 3919Dec 06, 2011 12:47 pm [quote="Rups"]Slab has been poured...!!! Can't wait to go and see it tonight!! Clock's ticking for the invoice to land[/quote Nothing happening at our place today but I did go and stalk the other Cayman being built around the corner from us and they've had site scrape but nothing else. I would have thought we'd have things done at the same time seeing as we're building the same house with the same SS and start time. Re: Porter Davis homes 3920Dec 06, 2011 1:07 pm JLD Nothing happening at our place today but I did go and stalk the other Cayman being built around the corner from us and they've had site scrape but nothing else. I would have thought we'd have things done at the same time seeing as we're building the same house with the same SS and start time. JLD, They will not do them both at the same stage as they can not utilise the same tradies at the same time. Having said that it makes you wonder though as our build the tradies have not been there an entire day, just half days here and there. Cheers, Alpal Building PD Heathmont 40 BLOG: http://alpal-pd-heathmont40.blogspot.com/ Deposit paid 19/08/2011 Contract signing 3/10/2011 Site Start 10/11/2011 Slab 23/11/2011 Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report 3 13998 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 109628 Hi there! Putting the feelers out there for those who have (or almost) built with Arli homes! Interested in your experiences who've built from their stock home designs… 0 26645 |