Cant see bricks being done.. Roof Tiles for sure though.
Browse Forums Building A New House Re: Porter Davis homes 3756Nov 21, 2011 1:42 pm Forrestdale 27 Land Titled:4/11/11 Building Permit:4/11/11 Site Start Date: 16/11/11 Slab Date: 01/12/11 Frame Date:05/12/11 http://hordefamilyhome.blogspot.com/ Re: Porter Davis homes 3758Nov 21, 2011 3:06 pm I suppose it depends on the SS and his tradies - I still think you may have a hat on by Christmas - I think mine all happened in about 2.5 weeks. Re: Porter Davis homes 3759Nov 21, 2011 3:18 pm Audreyand Oscar I suppose it depends on the SS and his tradies - I still think you may have a hat on by Christmas - I think mine all happened in about 2.5 weeks. Keep in mind L&R (like myself) are building 2 storey house... Will take slightly longer... I would be surprised if you get tiles and wrapped frame by XMAS if slab booked for Dec 1 Our slab is booked for this Friday and BC states that we should just make this by XMAS Cheers Cheers, Alpal Building PD Heathmont 40 BLOG: http://alpal-pd-heathmont40.blogspot.com/ Deposit paid 19/08/2011 Contract signing 3/10/2011 Site Start 10/11/2011 Slab 23/11/2011 Re: Porter Davis homes 3760Nov 21, 2011 3:20 pm nope - Sandpiper is single story - what can I say - I'm an optimist! Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report 3 12182 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 74219 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 105129 |