Browse Forums Building A New House Re: Porter Davis homes 3622Nov 03, 2011 9:45 am Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 3625Nov 03, 2011 3:33 pm Cheers, Alpal Building PD Heathmont 40 BLOG: http://alpal-pd-heathmont40.blogspot.com/ Deposit paid 19/08/2011 Contract signing 3/10/2011 Site Start 10/11/2011 Slab 23/11/2011 Re: Porter Davis homes 3628Nov 04, 2011 9:05 am Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 3630Nov 04, 2011 3:39 pm Ivanhoe 36 Dep:18-4-11 Tender:26-5-11 Colour/Electrical:8-6-11 Contract:29-6-11 Building Permit:6-7-11 Site Start:16-8-11 PCI:10-1-12 Handover:24-1-12 http://eli-kay-ivanhoe36.blogspot.com/ Re: What's under your bath tub? 3635Nov 04, 2011 10:43 pm Ours looked similar to yours, I did mention it to the SS and it was covered over before I had a chance to see. However, we had a fault with the bath tub and they had to cut a tile to replace the bath and I was suprised to see they had cleaned it up. (still waiting for the tile to be replaced ) Re: Porter Davis homes 3636Nov 04, 2011 10:45 pm thebigbuild I am interested to hear from a bunch of you on how many days between your contract signing and site start on average. Thanks guys.. Hi Big Build, We signed our contract 3/10/11 They are starting onsite 10/11/11 We made very little amendments from contract to construct drawings - this moved things along quickly Hope this helps Cheers, Alpal Building PD Heathmont 40 BLOG: http://alpal-pd-heathmont40.blogspot.com/ Deposit paid 19/08/2011 Contract signing 3/10/2011 Site Start 10/11/2011 Slab 23/11/2011 Re: Porter Davis homes 3637Nov 05, 2011 8:03 am DEMOLITION OF AN EXISTING PROPERTY PRIOR TO BUILDING Hello All, Has anyone undergone a demolition project prior to building a new home and if so, can you offer any advice / tips (including associated costs such as demo work, power installation, site costs, etc, etc) with getting the block ready for the new build? Also, if there were any specific things that had to be taken into account before being able to build a new home I'd be grateful for any info on those as well. Feel free to PM me if you prefer. Thanks in advance, Chorlton TIMING OF BUILD 25Feb - Site Start 25Mar - Base Stage Complete 31Mar - Frame Completed 11Apr - Roof Tiles 20Apr - Brickwork Started Re: Porter Davis homes 3638Nov 06, 2011 11:51 am Can someone that is constructing in a smart wired estate please let me know how much PD charges for additional data points. T The original basic package that we paid $1623 contained 1 Slimline enclosure & IR Compatible Distribution Hub 1 Double GPO for Optical Network Termination (ONT) Box 2 TV points 2 Phone Points 2 Data Points And thanks Rups for all your suggestions and drawings, I have some idea now. Re: Porter Davis homes 3640Nov 06, 2011 2:38 pm No worries J&C. Wateman's prices are spot on, and if you add a Foxtel IQ2 point (2 x RG6 + 1 x Data), it's $154. Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report 3 12320 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 74688 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 105491 |