Browse Forums Building A New House Re: Porter Davis homes 3443Oct 12, 2011 1:11 pm Ivanhoe 36 Dep:18-4-11 Tender:26-5-11 Colour/Electrical:8-6-11 Contract:29-6-11 Building Permit:6-7-11 Site Start:16-8-11 PCI:10-1-12 Handover:24-1-12 http://eli-kay-ivanhoe36.blogspot.com/ Porter Davis homes 3446Oct 12, 2011 9:51 pm Building the Drysdale 30 Wallara Waters, Wallan My Blog : http://www.ourwallanhome.blogspot.com My thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=50975 Re: Porter Davis homes 3449Oct 13, 2011 11:36 am Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 3452Oct 13, 2011 12:19 pm Ivanhoe 36 Dep:18-4-11 Tender:26-5-11 Colour/Electrical:8-6-11 Contract:29-6-11 Building Permit:6-7-11 Site Start:16-8-11 PCI:10-1-12 Handover:24-1-12 http://eli-kay-ivanhoe36.blogspot.com/ Re: Porter Davis homes 3453Oct 13, 2011 12:32 pm Ivanhoe 36 Dep:18-4-11 Tender:26-5-11 Colour/Electrical:8-6-11 Contract:29-6-11 Building Permit:6-7-11 Site Start:16-8-11 PCI:10-1-12 Handover:24-1-12 http://eli-kay-ivanhoe36.blogspot.com/ Porter Davis homes 3454Oct 13, 2011 1:25 pm Building the Drysdale 30 Wallara Waters, Wallan My Blog : http://www.ourwallanhome.blogspot.com My thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=50975 Re: Porter Davis homes 3460Oct 13, 2011 7:11 pm J & C Rups It's a completely separate line item in the contract, and is not 'bundled' with any other pack (like the smart wiring one for example). Nor is it included in the standard services connection item, which is only for water, gas, elec and waste. You will need to ask your BC to add it in, as it is not a standard item they include (beats me as to why not!) Ours is written as "provide Telstra underground cable trench up to 20m" $308. Not sure what heading it would appear under in your contract as ours was done as a PCV Hi Wrote to my BC and the production team at PD has advised her that Porter Davis will complete all of the pre wiring inside your home and will have a junction box installed below your metre box that will have a conduit connected to it that will go underground out to the Telstra pit in the footpath. I wonder in such a case if one will still have to pay Telstra an additional amount. Has anyone that has finished construction been in a similar situation. Cheers Hi J&C, After that you then just pay Telstra for the connection. Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report 3 12336 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 74701 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 105551 |