Browse Forums Building A New House Re: Porter Davis homes 3401Oct 11, 2011 11:31 am Ivanhoe 36 Dep:18-4-11 Tender:26-5-11 Colour/Electrical:8-6-11 Contract:29-6-11 Building Permit:6-7-11 Site Start:16-8-11 PCI:10-1-12 Handover:24-1-12 http://eli-kay-ivanhoe36.blogspot.com/ Re: Porter Davis homes 3415Oct 11, 2011 7:24 pm Ivanhoe 36 Dep:18-4-11 Tender:26-5-11 Colour/Electrical:8-6-11 Contract:29-6-11 Building Permit:6-7-11 Site Start:16-8-11 PCI:10-1-12 Handover:24-1-12 http://eli-kay-ivanhoe36.blogspot.com/ Re: Porter Davis homes 3418Oct 11, 2011 8:04 pm Ivanhoe 36 Dep:18-4-11 Tender:26-5-11 Colour/Electrical:8-6-11 Contract:29-6-11 Building Permit:6-7-11 Site Start:16-8-11 PCI:10-1-12 Handover:24-1-12 http://eli-kay-ivanhoe36.blogspot.com/ Re: Porter Davis homes 3419Oct 11, 2011 8:06 pm Wateman eli-kay123 Hi Waterman, You can have niches on external. We have a double niche in our ensuite. They wouldn't do it for us as it was going to be on an external wall but we kept pushing it because we knew it could be done. They are just being lazy and can't be bothered doing the extra work. We told PD they can build the wall out 900mm on the external wall to create a niche which meant they moved the whole shower forward by 900mm. In the end we got it. You have some cooling off days. Call them tomorrow asap and tell them you will cancel. Say you know it can be done. Tell them to do the same as what they did to ours. All the best. Is 900mm correct or did u mean 90mm? I don't think our bathrooms are big enough to move a wall that much :/ Sorry yes it should be 90mm. Ivanhoe 36 Dep:18-4-11 Tender:26-5-11 Colour/Electrical:8-6-11 Contract:29-6-11 Building Permit:6-7-11 Site Start:16-8-11 PCI:10-1-12 Handover:24-1-12 http://eli-kay-ivanhoe36.blogspot.com/ Re: Porter Davis homes 3420Oct 11, 2011 8:17 pm eli-kay123 Wateman eli-kay123 Hi Waterman, You can have niches on external. We have a double niche in our ensuite. They wouldn't do it for us as it was going to be on an external wall but we kept pushing it because we knew it could be done. They are just being lazy and can't be bothered doing the extra work. We told PD they can build the wall out 900mm on the external wall to create a niche which meant they moved the whole shower forward by 900mm. In the end we got it. You have some cooling off days. Call them tomorrow asap and tell them you will cancel. Say you know it can be done. Tell them to do the same as what they did to ours. All the best. Is 900mm correct or did u mean 90mm? I don't think our bathrooms are big enough to move a wall that much :/ Sorry yes it should be 90mm. The only way I can see it being done is shortening you WIR wall by 90mm and moving the sink and shower towards the WIR to fit the niche. It's only 90mm so wouldn't lose much in the WIR. You should be able to move the walls. It's only paperwork stage. The draftsman can do this in 10 mins. After our contract signing we had the cooling off period and we were allowed to make changes but not structurally. This isn't a structural change, you are moving a wall over by 90mm. Ivanhoe 36 Dep:18-4-11 Tender:26-5-11 Colour/Electrical:8-6-11 Contract:29-6-11 Building Permit:6-7-11 Site Start:16-8-11 PCI:10-1-12 Handover:24-1-12 http://eli-kay-ivanhoe36.blogspot.com/ Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report 3 12320 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 74688 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 105490 |