Browse Forums Building A New House Re: Knockdown and building Henley's Talise Q2 - At Fixing 171Sep 27, 2011 8:37 am Henley - Wilshire Mk 3 ... I love my house!! Site start: 4th Feb 09 Handover: 10th Sep 09 Blog: http://stormygirlscastle.blogspot.com/ Build Thread: viewtopic.php?t=7166 Re: Knockdown and building Henley's Talise Q2 - At Fixing 174Sep 27, 2011 6:56 pm Amazing,love the WIS.would love to see pic when you have your fire in. Re: Knockdown and building Henley's Talise Q2 - At Fixing 175Sep 27, 2011 9:56 pm Re: Knockdown and building Henley's Talise Q2 - At Fixing 176Sep 27, 2011 10:06 pm Ger1322, So where are you guys up to? You must be close now? Chatz Re: Knockdown and building Henley's Talise Q2 - At Fixing 177Sep 27, 2011 11:31 pm Omg chatz, you've almost finished! Your pics r great I can't believe u just walked in and turned lights on! Hehe. I went and visited ours today. Interior paint finished, all doors painted and hung, handles on cabinetry, powerpoints in and exterior doors at back have been painted. The bath tub and all sinks r sitting in the theatre room ready to be fitted in. One thing I noticed was that in our colour appt we had very clearly said we wanted tiles in our ensuite floor to run seamlessly up the shower wall. They haven't done this. They've put diff colour tiles on the wall.... Not sure if I can be bothered getting this fixed at this stage. I still haven't been able to upload photos its too confusing. Chatz, I tried your way but I get stuck half way through. Trudy Knockdown and building Henley's Talise Q2 - At Fixing 178Sep 27, 2011 11:51 pm Trudy, Would you believe we wandered around for 5 minutes with a torch before I thought to turn the lights on? I'll send you a link to another thread that has instructions doing it differently to me. Chatz Knockdown and building Henley's Talise Q2 - At Fixing 179Sep 27, 2011 11:56 pm Trudy, Alternatives for uploading pictures here: http://forum.homeone.com.au/viewtopic.php?t=1272 Chatz Re: Knockdown and building Henley's Talise Q2 - At Fixing 180Sep 28, 2011 6:40 pm chatz Ger1322, So where are you guys up to? You must be close now? Chatz Sure am mate, All interior done, except sealing eg. Basins, showers etc. few touch ups to be done including the whole ceiling in the family room ! Garage door to be fitted, Garage, porch, eaves and alfresco to be painted and thats it !!! Henley still reckon 4 - 6 weeks for handover though. I'll try and find the time to get some uploads onto the Blog, Chatz any jobs going where you work? don't know where you find the time. Cheers G Ger multiple occ properties are always billed by trades at a premium, rarely per sqm for the lot. You either have trades you know whoe will do by sqm or youre going to get… 1 3020 if the original house is in good condition most of what you listed could be added in stages without the need for KDR and costs and disruption of having to live elsewhere… 1 14390 Hi, If you give a set of criteria as to what means 'good' to you, it'll give others prompts to respond. We considered Henley early on but there were two factors that… 1 12993 |