Browse Forums Building A New House Re: Anyone else building in Glenmore Ridge? 2Jul 11, 2011 10:25 pm Building with Fairmont Homes NSW at Glenmore Ridge Lot 1007 Our Builder http://www.fairmonthomesnsw.com.au Our Blog http://drewandrenee.blogspot.com/ Re: Anyone else building in Glenmore Ridge? 4Jul 13, 2011 11:39 pm Building with Fairmont Homes NSW at Glenmore Ridge Lot 1007 Our Builder http://www.fairmonthomesnsw.com.au Our Blog http://drewandrenee.blogspot.com/ Re: Anyone else building in Glenmore Ridge? 15Jul 20, 2011 7:17 pm Building with Fairmont Homes NSW at Glenmore Ridge Lot 1007 Our Builder http://www.fairmonthomesnsw.com.au Our Blog http://drewandrenee.blogspot.com/ Re: Anyone else building in Glenmore Ridge? 16Jul 20, 2011 7:19 pm Building with Fairmont Homes NSW at Glenmore Ridge Lot 1007 Our Builder http://www.fairmonthomesnsw.com.au Our Blog http://drewandrenee.blogspot.com/ Re: Anyone else building in Glenmore Ridge? 18Jul 20, 2011 8:35 pm Building with Fairmont Homes NSW at Glenmore Ridge Lot 1007 Our Builder http://www.fairmonthomesnsw.com.au Our Blog http://drewandrenee.blogspot.com/ Re: Anyone else building in Glenmore Ridge? 19Jul 20, 2011 8:51 pm Building with Fairmont Homes NSW at Glenmore Ridge Lot 1007 Our Builder http://www.fairmonthomesnsw.com.au Our Blog http://drewandrenee.blogspot.com/ Re: Anyone else building in Glenmore Ridge? 20Jul 20, 2011 9:12 pm We really liked the Manhattan as well but it was too long for our block. We are a north facing block so have to have an 8m setback from the rear. We are happy with the Majestic. it seems to tick all the boxes for us with the only change by swapping the back part around so it works better with our funny shaped block.... We are still waiting for our revised tender. Promised last friday... still nothing. They quoted us for a double sided gas fire, a sexy looking one that was 1200 wide and slim would have looked great if only I had an extra 20K to spare... we wanted a 700 single sided one plus one or two other changes then we hope we can sign this one off. Matt and Linda - where are you in the build process? Has it been through council? I am feeling scared now that you say they take a long time.... have you done the colour selections etc. I am waiting to find out how much a brick upgrade will be plus I just want to get the colour consultations done so we know how much extra we may be up for tile or kitchen upgrades... Drew and Renee - Frame delivery - things are moving along nicely! Cannot wait to see the grinding of the slab.. it will look fantastic. Off to finish my landscape plan so that it can be ready when wisdom are ready to submit to developer and council... A survey must’ve completed by a certified surveyor. This form part of every DA requirement 3 225456 Wish you all the best. Once you signed the contract, they will find millions excuses to charge you. And have seen their sites unfinished for a long time. 4 25527 As title suggests, looking at using the interlocking Pentablock stacked stone products to replace failing timber retaining… 0 18487 |