Would love to hear if anyone has actually got a "sweet deal" there?
We did buy a rug there, which I have seen one at Target which is smaller but the same type, we paid $170 and the smaller one at Target is $200.
So we got a little sweet deal
Browse Forums Building A New House Re: Porter Davis homes 2621Jul 06, 2011 8:32 pm My building thread : viewtopic.php?f=31&t=36059 Paid initial deposit 24/7/10 Tender appointment 20/8/2010 Flooring and tile appointment 25/9/10 Colour and Electrical appointment 13/9/10 December site start delayed Site start (YAY!) 17/1/11 Slab pour 1/2/2011 Re: Porter Davis homes 2625Jul 07, 2011 9:01 am Initial Deposit 05/09/2010 Tender 21/10/2010 Contract 26/11/2010 Site Start 11 Feb Bricking underway 28/03 Fitout commenced 20/04 PCI 08/07 Settlement 15/07 build Blog http://foxley29.blogspot.com/ Re: Porter Davis homes 2627Jul 07, 2011 9:30 am Ivanhoe 36 Dep:18-4-11 Tender:26-5-11 Colour/Electrical:8-6-11 Contract:29-6-11 Building Permit:6-7-11 Site Start:16-8-11 PCI:10-1-12 Handover:24-1-12 http://eli-kay-ivanhoe36.blogspot.com/ Re: Porter Davis homes 2628Jul 07, 2011 11:20 am Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 2633Jul 07, 2011 2:33 pm Ivanhoe 36 Dep:18-4-11 Tender:26-5-11 Colour/Electrical:8-6-11 Contract:29-6-11 Building Permit:6-7-11 Site Start:16-8-11 PCI:10-1-12 Handover:24-1-12 http://eli-kay-ivanhoe36.blogspot.com/ Re: Porter Davis homes 2634Jul 07, 2011 2:43 pm Ivanhoe 36 Dep:18-4-11 Tender:26-5-11 Colour/Electrical:8-6-11 Contract:29-6-11 Building Permit:6-7-11 Site Start:16-8-11 PCI:10-1-12 Handover:24-1-12 http://eli-kay-ivanhoe36.blogspot.com/ Re: Porter Davis homes 2639Jul 07, 2011 5:18 pm Roshi Hi Chorlton, I cannot figure out based on the floor plan and will add it here to see whether you would be able to identify it. Thanks.... Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Chorlton Hi Roshi, What does your floor plan show? There should be a note on there identifying which walls will have plasterboard. i would say the entry/garage wall is plastered and the other two bricked. Building the Porter Davis Sandhurst 33 Our Thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=42820&start=20 Re: Porter Davis homes 2640Jul 07, 2011 5:52 pm Roshi Hi Chorlton, I cannot figure out based on the floor plan and will add it here to see whether you would be able to identify it. Thanks.... Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Chorlton Hi Roshi, What does your floor plan show? There should be a note on there identifying which walls will have plasterboard. As tstr1a has commented, based on the floor plan I would say its face brick only in the Garage. TIMING OF BUILD 25Feb - Site Start 25Mar - Base Stage Complete 31Mar - Frame Completed 11Apr - Roof Tiles 20Apr - Brickwork Started Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report 3 12332 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 74701 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 105533 |