Browse Forums Building A New House Re: Porter Davis homes 2363Jun 15, 2011 10:30 am Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 2365Jun 15, 2011 12:05 pm Ivanhoe 36 Dep:18-4-11 Tender:26-5-11 Colour/Electrical:8-6-11 Contract:29-6-11 Building Permit:6-7-11 Site Start:16-8-11 PCI:10-1-12 Handover:24-1-12 http://eli-kay-ivanhoe36.blogspot.com/ Re: Porter Davis homes 2368Jun 15, 2011 12:25 pm Ivanhoe 36 Dep:18-4-11 Tender:26-5-11 Colour/Electrical:8-6-11 Contract:29-6-11 Building Permit:6-7-11 Site Start:16-8-11 PCI:10-1-12 Handover:24-1-12 http://eli-kay-ivanhoe36.blogspot.com/ Re: Porter Davis homes 2369Jun 15, 2011 12:34 pm Ivanhoe 36 Dep:18-4-11 Tender:26-5-11 Colour/Electrical:8-6-11 Contract:29-6-11 Building Permit:6-7-11 Site Start:16-8-11 PCI:10-1-12 Handover:24-1-12 http://eli-kay-ivanhoe36.blogspot.com/ Re: Porter Davis homes 2370Jun 15, 2011 2:40 pm Site cut: 2 June 2010 Slab Poured: 2 Oct 2010 Frame Stage: 12 Oct 2010 Lock up: Dec 2010 Fixing Stage: March 2011 http://karasdreamhome.blogspot.com/ Re: Porter Davis homes 2374Jun 15, 2011 4:30 pm Site cut: 2 June 2010 Slab Poured: 2 Oct 2010 Frame Stage: 12 Oct 2010 Lock up: Dec 2010 Fixing Stage: March 2011 http://karasdreamhome.blogspot.com/ Re: Porter Davis homes 2377Jun 15, 2011 5:02 pm Chorlton Tiled Skirtings in Bathroom / Ensuite ? Hello All, For all those who have already built (or are at least now completed the floor tiling stage) do you have tiled skirtings in the Bathrooms / Ensuites? If so, can I ask how the transition between the tiled skirtings and the normal timber skirtings was achieved? Thanks in advance, Chorlton We have it, but it wasn't included as standard. The tiled skirting starts at the door frame so there is no actual connection between the normal MDF skirting and the tiled skirting. The door frame separates the two. I leave you to fend for yourself, figure things out yourself. Terrence Malick Re: Porter Davis homes 2378Jun 15, 2011 5:04 pm tstr1a Chorlton Tiled Skirtings in Bathroom / Ensuite ? Hello All, For all those who have already built (or are at least now completed the floor tiling stage) do you have tiled skirtings in the Bathrooms / Ensuites? If so, can I ask how the transition between the tiled skirtings and the normal timber skirtings was achieved? Thanks in advance, Chorlton Tiled skirting was included as part of our promo Have you completed the tiling yet and if so, how did they transition from tiled to timber skirts? TIMING OF BUILD 25Feb - Site Start 25Mar - Base Stage Complete 31Mar - Frame Completed 11Apr - Roof Tiles 20Apr - Brickwork Started Re: Porter Davis homes 2379Jun 15, 2011 5:08 pm Chorlton tstr1a Chorlton Tiled Skirtings in Bathroom / Ensuite ? Hello All, For all those who have already built (or are at least now completed the floor tiling stage) do you have tiled skirtings in the Bathrooms / Ensuites? If so, can I ask how the transition between the tiled skirtings and the normal timber skirtings was achieved? Thanks in advance, Chorlton Tiled skirting was included as part of our promo Have you completed the tiling yet and if so, how did they transition from tiled to timber skirts? I assuming that they will start the tiling from door jams/skirting. What has happened in your situation? Re: Porter Davis homes 2380Jun 15, 2011 5:31 pm joles Chorlton Tiled Skirtings in Bathroom / Ensuite ? Hello All, For all those who have already built (or are at least now completed the floor tiling stage) do you have tiled skirtings in the Bathrooms / Ensuites? If so, can I ask how the transition between the tiled skirtings and the normal timber skirtings was achieved? Thanks in advance, Chorlton We have it, but it wasn't included as standard. The tiled skirting starts at the door frame so there is no actual connection between the normal MDF skirting and the tiled skirting. The door frame separates the two. Thats a nice execution and would have been my first choice. Unfortunately, due to the layout of the home there is no door frame between Master Bed and Ensuite so I'm forced to have the transition half way along a wall which will not look that good. TIMING OF BUILD 25Feb - Site Start 25Mar - Base Stage Complete 31Mar - Frame Completed 11Apr - Roof Tiles 20Apr - Brickwork Started Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report 3 12336 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 74701 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 105553 |