Easy, just say "hun, I'm popping out, will be back soon. I'll pick up a bottle of red on the way back".
..... Oh it's only 2 sleeps till Saturday.
Browse Forums Building A New House Re: Porter Davis homes 2281Jun 09, 2011 1:40 pm Ivanhoe 36 Dep:18-4-11 Tender:26-5-11 Colour/Electrical:8-6-11 Contract:29-6-11 Building Permit:6-7-11 Site Start:16-8-11 PCI:10-1-12 Handover:24-1-12 http://eli-kay-ivanhoe36.blogspot.com/ Re: Porter Davis homes 2292Jun 09, 2011 3:08 pm My building thread : viewtopic.php?f=31&t=36059 Paid initial deposit 24/7/10 Tender appointment 20/8/2010 Flooring and tile appointment 25/9/10 Colour and Electrical appointment 13/9/10 December site start delayed Site start (YAY!) 17/1/11 Slab pour 1/2/2011 Re: Porter Davis homes 2298Jun 09, 2011 3:30 pm Hi, On our plans it shows that only 2 walls are to be plastered. Those walls are the internal walls, which are the laundry wall and entry wall for us, though they have plasterd all of the garage and have left a little exposed brick around the rear access garage door. take a look on my thread. Page 10 there is a pic of the facade where you can see the inside of our garage. Building the Porter Davis Sandhurst 33 Our Thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=42820&start=20 Re: Porter Davis homes 2299Jun 09, 2011 4:18 pm Can anyone tell me if they had the flooring included in their promo (Cat 1 Tiles, Cat 2 Carpet) but decided to source their own flooring elsewhere. Did PD give you a credit for not going ahead with them. Ivanhoe 36 Dep:18-4-11 Tender:26-5-11 Colour/Electrical:8-6-11 Contract:29-6-11 Building Permit:6-7-11 Site Start:16-8-11 PCI:10-1-12 Handover:24-1-12 http://eli-kay-ivanhoe36.blogspot.com/ Re: Porter Davis homes 2300Jun 09, 2011 4:26 pm eli-kay123 Can anyone tell me if they had the flooring included in their promo (Cat 1 Tiles, Cat 2 Carpet) but decided to source their own flooring elsewhere. Did PD give you a credit for not going ahead with them. i spoke to my CSC about a credit and she said no. i upgraded the tiles and carpet was close to wat we wanted. Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report 3 12335 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 74701 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 105539 |