Browse Forums Building A New House Re: Porter Davis homes 2281Jun 09, 2011 2:40 pm Ivanhoe 36 Dep:18-4-11 Tender:26-5-11 Colour/Electrical:8-6-11 Contract:29-6-11 Building Permit:6-7-11 Site Start:16-8-11 PCI:10-1-12 Handover:24-1-12 http://eli-kay-ivanhoe36.blogspot.com/ Re: Porter Davis homes 2292Jun 09, 2011 4:08 pm My building thread : viewtopic.php?f=31&t=36059 Paid initial deposit 24/7/10 Tender appointment 20/8/2010 Flooring and tile appointment 25/9/10 Colour and Electrical appointment 13/9/10 December site start delayed Site start (YAY!) 17/1/11 Slab pour 1/2/2011 Re: Porter Davis homes 2294Jun 09, 2011 4:12 pm tstr1a Chorlton post a pic of your garage plan so we can all see. Cheers I'll try to do it later today..... BTW: Wall between House and Garage is mostly just timber. TIMING OF BUILD 25Feb - Site Start 25Mar - Base Stage Complete 31Mar - Frame Completed 11Apr - Roof Tiles 20Apr - Brickwork Started Re: Porter Davis homes 2295Jun 09, 2011 4:13 pm Chorlton tstr1a Chorlton post a pic of your garage plan so we can all see. Cheers I'll try to do it later today..... BTW: Wall between House and Garage is mostly just timber. Love to see you build in progress, do you have a thread or a blog? Re: Porter Davis homes 2296Jun 09, 2011 4:19 pm building1 To be quite honest I haven't even had a good look at the garage, I know some is plaster and some isn't, and to be perfectly honest I don't even care what the garage looks like I'll park my car and go to the kitchen LMAO Alot of our garage walls will be covered by tools and storage shelves... I accept your point and in the grand scheme of things its not that important. However, like a lot of building related things if it looks right it probably is and if it doesn't then it stands out and people question it. Having an area of no more than 2m brickwork and the rest plasterboard looks basically unfinished and is clearly visible when the garage door is open. If they had built it as per the plans then the external garage side wall would also be brickwork and as a result would be a lot less noticable. Am I going to ask PD to remove the plasterboard which is wrongly fitted? Of course not, but at the same time the current finish looks strange IMO. PS. Tstra1a..... No blog unfortunately as I just haven't had the time to create and update one. But I will try to sort out some pics for those interested......... TIMING OF BUILD 25Feb - Site Start 25Mar - Base Stage Complete 31Mar - Frame Completed 11Apr - Roof Tiles 20Apr - Brickwork Started Re: Porter Davis homes 2297Jun 09, 2011 4:20 pm Hi, I just looked at my plans & have the plasterboards throughout the rear wall only as attached. I thought the entire garage would cover up with the plasterboards. Learning to study the final drawings at the later stage... [img][IMG]http://img845.imageshack.us/img845/7006/garagewall.jpg[/img][/img] Re: Porter Davis homes 2298Jun 09, 2011 4:30 pm Hi, On our plans it shows that only 2 walls are to be plastered. Those walls are the internal walls, which are the laundry wall and entry wall for us, though they have plasterd all of the garage and have left a little exposed brick around the rear access garage door. take a look on my thread. Page 10 there is a pic of the facade where you can see the inside of our garage. Building the Porter Davis Sandhurst 33 Our Thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=42820&start=20 Re: Porter Davis homes 2299Jun 09, 2011 5:18 pm Can anyone tell me if they had the flooring included in their promo (Cat 1 Tiles, Cat 2 Carpet) but decided to source their own flooring elsewhere. Did PD give you a credit for not going ahead with them. Ivanhoe 36 Dep:18-4-11 Tender:26-5-11 Colour/Electrical:8-6-11 Contract:29-6-11 Building Permit:6-7-11 Site Start:16-8-11 PCI:10-1-12 Handover:24-1-12 http://eli-kay-ivanhoe36.blogspot.com/ Re: Porter Davis homes 2300Jun 09, 2011 5:26 pm eli-kay123 Can anyone tell me if they had the flooring included in their promo (Cat 1 Tiles, Cat 2 Carpet) but decided to source their own flooring elsewhere. Did PD give you a credit for not going ahead with them. i spoke to my CSC about a credit and she said no. i upgraded the tiles and carpet was close to wat we wanted. Wow that is terrible about the insurance! I guess ideally proof of insurance should be provided prior to first deposit but I'd imagine they would refuse to be out of… 17 14248 There isn't any need to. As I wrote previously, there isn't a set term, there is just commencement based on earlier of contract signing or building permit issue and… 24 13408 Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report 3 6510 |