does it mean they have your list of issues from your PCI and thats the maintenanance stuff they need to complete?
Ooh that could be it... well it's three days after I listed them.. Not happy about that if it is.
Browse Forums Building A New House Re: Porter Davis homes 1542Apr 07, 2011 9:24 pm Site cut: 2 June 2010 Slab Poured: 2 Oct 2010 Frame Stage: 12 Oct 2010 Lock up: Dec 2010 Fixing Stage: March 2011 http://karasdreamhome.blogspot.com/ Re: Porter Davis homes 1544Apr 07, 2011 9:32 pm __________________________________________ Built Camberwell 29 with PD - Hand Over was on 22/12/10 http://ssazcamberwell29.blogspot.com/ Re: Porter Davis homes 1547Apr 08, 2011 10:18 am Site cut: 2 June 2010 Slab Poured: 2 Oct 2010 Frame Stage: 12 Oct 2010 Lock up: Dec 2010 Fixing Stage: March 2011 http://karasdreamhome.blogspot.com/ Re: Porter Davis homes 1549Apr 09, 2011 7:11 pm __________________________________________ Built Camberwell 29 with PD - Hand Over was on 22/12/10 http://ssazcamberwell29.blogspot.com/ Re: Porter Davis homes 1551Apr 10, 2011 4:05 pm Site cut: 2 June 2010 Slab Poured: 2 Oct 2010 Frame Stage: 12 Oct 2010 Lock up: Dec 2010 Fixing Stage: March 2011 http://karasdreamhome.blogspot.com/ Re: Porter Davis homes 1555Apr 10, 2011 10:00 pm Building Waldorf 44 with PD Feel free to follow our build progress - http://melnrobsknockdownrebuild.blogspot.com/ Re: Porter Davis homes 1559Apr 11, 2011 9:00 am Site cut: 2 June 2010 Slab Poured: 2 Oct 2010 Frame Stage: 12 Oct 2010 Lock up: Dec 2010 Fixing Stage: March 2011 http://karasdreamhome.blogspot.com/ Re: Porter Davis homes 1560Apr 11, 2011 3:56 pm https://picasaweb.google.com/1157727297 ... 6337498434 Guys, I went past a site (another builder---- NOT PD) and check out the gap between the frame and the window. The window was held together by the edge of the nail. Also, I don't think silicon can fill this gap! Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report 3 12335 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 74701 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 105534 |