Browse Forums Building A New House Re: Porter Davis homes 1401Mar 16, 2011 6:15 pm Site cut: 2 June 2010 Slab Poured: 2 Oct 2010 Frame Stage: 12 Oct 2010 Lock up: Dec 2010 Fixing Stage: March 2011 http://karasdreamhome.blogspot.com/ Re: Porter Davis homes 1402Mar 16, 2011 6:18 pm Site cut: 2 June 2010 Slab Poured: 2 Oct 2010 Frame Stage: 12 Oct 2010 Lock up: Dec 2010 Fixing Stage: March 2011 http://karasdreamhome.blogspot.com/ Re: Porter Davis homes 1403Mar 17, 2011 10:19 am Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 1404Mar 17, 2011 10:26 am __________________________________________ Built Camberwell 29 with PD - Hand Over was on 22/12/10 http://ssazcamberwell29.blogspot.com/ Re: Porter Davis homes 1405Mar 17, 2011 2:37 pm Site cut: 2 June 2010 Slab Poured: 2 Oct 2010 Frame Stage: 12 Oct 2010 Lock up: Dec 2010 Fixing Stage: March 2011 http://karasdreamhome.blogspot.com/ Re: Porter Davis homes 1406Mar 17, 2011 2:54 pm Site cut: 2 June 2010 Slab Poured: 2 Oct 2010 Frame Stage: 12 Oct 2010 Lock up: Dec 2010 Fixing Stage: March 2011 http://karasdreamhome.blogspot.com/ Re: Porter Davis homes 1407Mar 17, 2011 3:28 pm Building Waldorf 44 with PD Feel free to follow our build progress - http://melnrobsknockdownrebuild.blogspot.com/ Re: Porter Davis homes 1408Mar 17, 2011 3:57 pm Site cut: 2 June 2010 Slab Poured: 2 Oct 2010 Frame Stage: 12 Oct 2010 Lock up: Dec 2010 Fixing Stage: March 2011 http://karasdreamhome.blogspot.com/ Re: Porter Davis homes 1411Mar 17, 2011 6:21 pm Site cut: 2 June 2010 Slab Poured: 2 Oct 2010 Frame Stage: 12 Oct 2010 Lock up: Dec 2010 Fixing Stage: March 2011 http://karasdreamhome.blogspot.com/ Re: Porter Davis homes 1416Mar 17, 2011 10:30 pm baronx Team PD.. On our contract appointment, we were give two type of contracts to sign; the HIA contract and the Porter Davis specific contract containing the drawings, tender variations, soil tests etc. We had already gone through the HIA contract at home as a blank copy was provided to us during tender appointment. But the Porter Davis contract needed to be read and the drawings checked thoroughly. So, when I asked my admin if we could take them home to read, she said that it's the policy to not let the customers take the documents without signing the contract. It was mentioned to us that there’s a 5 day cooling-off period if something’s wrong. But, I think it’s much easier to get things rectified earlier rather than later. In the end, we had to come back home without signing the contract as there wasn't much time left to check everything and will have to go back again.. adding to the frustration It’s completely unfair if PD has a policy like this.. Can you please comment on this? And is this even legal? Saying that, I must add that our admin has been the most co-operative, to which I’m very thankful, but this time she wouldn’t budge (I tried ... a lot!). Yep this is CRAZY. Team PD, this is bullying tactics. you should refuse to sign contracts if you are not allowed to take them home to review. The only reason why PD get away within is because most people don’t know any better. This is what PD thrive on... PD… ‘the most unprofessional builder’ Re: Porter Davis homes 1417Mar 17, 2011 11:21 pm Agreed, its not a good way to do business. When we signed off on our plans PD had made changes to the kitchen and shrunk the island bench considerably. We believed that we were getting what was shown at the display home and were disapointed when we saw the 'new spec' kitchen. By providing your clients with these contracts and give them time to consider what is in front of them would be far more professional To their credit, PD did rectify the kitchen bench but we paid extra for it (around $900). Felt it was very unfair Re: Porter Davis homes 1418Mar 18, 2011 7:32 am Couldn't agree more, I asked for a copy of the contract to be emailed to me so i could ensure everything was included and all selections were correct, I was happy for no prices to be included if that was the issue but was told it could not be done. In fact, our contract signing is on Monday and we have been told some prices will not even be known until the day of signing. This screams out to me that we won't be happy with the prices and they will just hope we will be so over it we will sign on the day. I will not be signing anything until the plans are correct and all inclusions are in writing as I don't trust their ability to get it right in a PCV, too many stories of the left hand not talking to the right so I want to make sure its all correct from the get go. It would have been easier if I could sight the contract and let the CSA know before the contract signing of any mistakes. Re: Porter Davis homes 1419Mar 18, 2011 7:40 am Lunchtime Agreed, its not a good way to do business. When we signed off on our plans PD had made changes to the kitchen and shrunk the island bench considerably. We believed that we were getting what was shown at the display home and were disapointed when we saw the 'new spec' kitchen. By providing your clients with these contracts and give them time to consider what is in front of them would be far more professional To their credit, PD did rectify the kitchen bench but we paid extra for it (around $900). Felt it was very unfair That is no credit to PD at all if you had to pay!!! I know one case where the client did not want to include the floor tiles in the contract as they wanted to procure their own flooring. PD gave them in return $140 to not do the tiles. THIS IS BS!!! the cost of tiles and labour would easily have been 3k. the floor they put in cost them 4k... $140 is an insult to the client. i would have gotten a quote to supply and install the tiles and demand a percentage of that quote. With my builder i swapped a 5 x 4m section of tiles for carpet. I got $300 back!!! PD SUCK!!! Re: Porter Davis homes 1420Mar 18, 2011 7:47 am Titch101 Couldn't agree more, I asked for a copy of the contract to be emailed to me so i could ensure everything was included and all selections were correct, I was happy for no prices to be included if that was the issue but was told it could not be done. In fact, our contract signing is on Monday and we have been told some prices will not even be known until the day of signing. This screams out to me that we won't be happy with the prices and they will just hope we will be so over it we will sign on the day. I will not be signing anything until the plans are correct and all inclusions are in writing as I don't trust their ability to get it right in a PCV, too many stories of the left hand not talking to the right so I want to make sure its all correct from the get go. It would have been easier if I could sight the contract and let the CSA know before the contract signing of any mistakes. With my builder I was given the chance to check the contract for mistakes (two weeks) actually their process is the following: - Sales deposit - Colour browse with a staff member - Colour/hardware Selection - Tender appointment. At this appointment the drawings and colour documents are presented and handed over. You are then given time to check over and change things if required. i also obtained to contract at this stage - Contract signing appointment. I did not sign the contract at this appointment as i wanted to ensure all my finances were fully un conditional. This process took 2 weeks. i did not have any issues with the builder. Builders do try to say that there is a clause in the contract that says if finance falls through you can get out of the contract. This is pressure tactics again. Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report 3 12338 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 74708 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 105564 |