Browse Forums Building A New House Re: Porter Davis homes 1288Mar 03, 2011 7:08 pm Site cut: 2 June 2010 Slab Poured: 2 Oct 2010 Frame Stage: 12 Oct 2010 Lock up: Dec 2010 Fixing Stage: March 2011 http://karasdreamhome.blogspot.com/ Re: Porter Davis homes 1290Mar 03, 2011 7:43 pm My building thread : viewtopic.php?f=31&t=36059 Paid initial deposit 24/7/10 Tender appointment 20/8/2010 Flooring and tile appointment 25/9/10 Colour and Electrical appointment 13/9/10 December site start delayed Site start (YAY!) 17/1/11 Slab pour 1/2/2011 Re: Porter Davis homes 1292Mar 04, 2011 6:26 am Does anyone have an idea about how we can request a new CSA? After 2 months re-writing PCV's for things that were raised at Tender and not recorded properly, we are now having issues on site with Materials being wrong, and this is delaying the trades. The SS blames the office and the CSA blames someone else The worst part is being told little white ******, to justify PD's position on things that are wrong. I shouldn't need to ask for the correct plans to be placed onsite for the trades 5 times Initial Deposit 05/09/2010 Tender 21/10/2010 Contract 26/11/2010 Site Start 11 Feb Bricking underway 28/03 Fitout commenced 20/04 PCI 08/07 Settlement 15/07 build Blog http://foxley29.blogspot.com/ Re: Porter Davis homes 1293Mar 04, 2011 6:33 am Lunchtime If anyone is building the Platinum promotion with PD, can you advise if the network controller is 2 units or 1 thanks Network controller? Do you mean the heating and cooling? Re: Porter Davis homes 1294Mar 04, 2011 8:18 am Victoria_g06 Lunchtime If anyone is building the Platinum promotion with PD, can you advise if the network controller is 2 units or 1 thanks Network controller? Do you mean the heating and cooling? Yes, thats right. It was part of the promotional upgrades and I was kind of expecting it would be one unit that does both but apparently this isnt correct so just wanted to check Re: Porter Davis homes 1295Mar 04, 2011 8:58 am JPZ Is it worthwhile to get a independent inspection at the base stage? ie. before the slab is poured. I've heard that its important for the foundations to be right so that there's no major problems later. However, my SS tells me that there will be an inspection by the guys who issued the building permit anyway and suggests its not necessary. Hi JPZ, Your SS is quite right. The building surveyor who issues your building permit must ensure your slab is ready to build on. The building surveyor also inspects your home at frame and settlement stage. On top of this, we have arranged independent inspections with BSS Design Group at lock up, fixing, PCI and settlement stages. You can view each construction stage here on the Porter Davis blog: http://blog.porterdavis.com.au/index.ph ... -and-when/ However, it is up to you if you would like to hire an Independent Inspector in addition to the building surveyors inspections and the independent inspections by BSS Design Group. Just remember to discuss it first with your SS. Cheers, Jess. Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 1296Mar 04, 2011 9:05 am lastone Hi again Insulation: we're about to put down a depoist with PD and I've only just realised just now that it seems that PD do not insulate walls as standard Is this right? And has anyone added insulation to the contract and roughly what did it cost? Also, are you happy with the heating unit? Hi lastone, To help answer your question, walling insulation is not a standard inclusion. All Porter Davis homes come complete with R2.5 ceiling insulation batts as standard. If you want to further insulate, speak to your sales consultant about your insulation upgrade options, including walling insulation. You can find more info on insulation the Porter Davis Blog: http://blog.porterdavis.com.au/?s=insulate Cheers, Jess. Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 1297Mar 04, 2011 9:26 am fingers crossed Just wondering - we are up to fit off stage - where Mirrors, shower screens, power points etc will start to go in and be fitted off. how long would this take - Hi fingers crossed, This is probably a question your CSA will be able to help you with. Just ask them for a rough estimate on your timeframe for fixing stage as the duration is unique to your particular build. Every house is different depending on size and variations. Also it's dependent on weather and availability of trades. Cheers, Jess. Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 1298Mar 04, 2011 10:13 am George's Does anyone have an idea about how we can request a new CSA? After 2 months re-writing PCV's for things that were raised at Tender and not recorded properly, we are now having issues on site with Materials being wrong, and this is delaying the trades. The SS blames the office and the CSA blames someone else The worst part is being told little white ******, to justify PD's position on things that are wrong. I shouldn't need to ask for the correct plans to be placed onsite for the trades 5 times Hi George's, I am sorry to hear that you've been experiencing difficulties dealing with your CSA and understand your frustrations. I would like to look into the matter further to see if I can offer any assistance. Would you mind sending me a private message with your full name, lot address, phone number, the main PD office you've been dealing with (i.e. Lifestyle East, etc) and the name of your CSA so that I can look into this for you. Cheers, Jess. Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 1299Mar 04, 2011 10:25 am Team PD lastone Hi again Insulation: we're about to put down a depoist with PD and I've only just realised just now that it seems that PD do not insulate walls as standard Is this right? And has anyone added insulation to the contract and roughly what did it cost? Also, are you happy with the heating unit? Hi lastone, To help answer your question, walling insulation is not a standard inclusion. All Porter Davis homes come complete with R2.5 ceiling insulation batts as standard. If you want to further insulate, speak to your sales consultant about your insulation upgrade options, including walling insulation. You can find more info on insulation the Porter Davis Blog: http://blog.porterdavis.com.au/?s=insulate Cheers, Jess. Jess, are you sure its the R 2.5 ceiling insulation batts? coz we have been given loose Cellulose. I too was under this impression that we were to receive batts but wasn't the case. Re: Porter Davis homes 1300Mar 04, 2011 10:35 am 46fan Team PD lastone Hi again Insulation: we're about to put down a depoist with PD and I've only just realised just now that it seems that PD do not insulate walls as standard Is this right? And has anyone added insulation to the contract and roughly what did it cost? Also, are you happy with the heating unit? Hi lastone, To help answer your question, walling insulation is not a standard inclusion. All Porter Davis homes come complete with R2.5 ceiling insulation batts as standard. If you want to further insulate, speak to your sales consultant about your insulation upgrade options, including walling insulation. You can find more info on insulation the Porter Davis Blog: http://blog.porterdavis.com.au/?s=insulate Cheers, Jess. I’m building a 44 sq home and R2 wall batts is $3200 Jess, are you sure its the R 2.5 ceiling insulation batts? coz we have been given loose Cellulose. I too was under this impression that we were to receive batts but wasn't the case. Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report 3 12182 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 74219 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 105129 |