They dont want to do this for some reason..
Browse Forums Building A New House Re: Porter Davis homes 903Jan 28, 2011 9:35 am Initial Deposit 05/09/2010 Tender 21/10/2010 Contract 26/11/2010 Site Start 11 Feb Bricking underway 28/03 Fitout commenced 20/04 PCI 08/07 Settlement 15/07 build Blog http://foxley29.blogspot.com/ Re: Porter Davis homes 919Jan 31, 2011 6:30 am __________________________________________ Built Camberwell 29 with PD - Hand Over was on 22/12/10 http://ssazcamberwell29.blogspot.com/ Re: Porter Davis homes 920Jan 31, 2011 8:56 am I got dilemma here. I was told that I'm not allowed to change the facade because the drawings has been ordered. Very disappointed. Should I pull out? I haven't signed anything. But in the same time, I don't like to look around again - it's very time consuming. Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report 3 12335 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 74701 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 105542 |