Browse Forums Building A New House Re: Building the Waterfall by Clarendon in Sydney 743Dec 11, 2010 2:48 pm Deposit paid 1/12/2009 Contracts signed 28/4/2010 Slab laid 25/7 Frame started 16/8 Plumbing 26/8 Brickwork finished 11/10 Roof tiled 20/10 Guttering 28/10 Wet Areas 30/11 Electrical roughing in 31/11 Insulation 8/12 Gyprock 9/12 Stairs installed 14/12 Doors and architraves installed 16/12 Lockup 17/12 Re: Building the Waterfall by Clarendon in Sydney 746Dec 12, 2010 4:44 pm For all your joinery needs, we custom build kitchens, office, wardrobes, garage, laundry fit outs plus TV units, pantry, linen and everything in between. PM me for more info or details. Re: Building the Waterfall by Clarendon in Sydney 747Dec 12, 2010 6:42 pm Deposit paid 1/12/2009 Contracts signed 28/4/2010 Slab laid 25/7 Frame started 16/8 Plumbing 26/8 Brickwork finished 11/10 Roof tiled 20/10 Guttering 28/10 Wet Areas 30/11 Electrical roughing in 31/11 Insulation 8/12 Gyprock 9/12 Stairs installed 14/12 Doors and architraves installed 16/12 Lockup 17/12 Re: Building the Waterfall by Clarendon in Sydney 752Dec 12, 2010 10:07 pm For all your joinery needs, we custom build kitchens, office, wardrobes, garage, laundry fit outs plus TV units, pantry, linen and everything in between. PM me for more info or details. Re: Building the Waterfall by Clarendon in Sydney 753Dec 13, 2010 7:00 am Deposit paid 1/12/2009 Contracts signed 28/4/2010 Slab laid 25/7 Frame started 16/8 Plumbing 26/8 Brickwork finished 11/10 Roof tiled 20/10 Guttering 28/10 Wet Areas 30/11 Electrical roughing in 31/11 Insulation 8/12 Gyprock 9/12 Stairs installed 14/12 Doors and architraves installed 16/12 Lockup 17/12 Re: Building the Waterfall by Clarendon in Sydney 754Dec 13, 2010 11:21 am Deposit paid 1/12/2009 Contracts signed 28/4/2010 Slab laid 25/7 Frame started 16/8 Plumbing 26/8 Brickwork finished 11/10 Roof tiled 20/10 Guttering 28/10 Wet Areas 30/11 Electrical roughing in 31/11 Insulation 8/12 Gyprock 9/12 Stairs installed 14/12 Doors and architraves installed 16/12 Lockup 17/12 Re: Building the Waterfall by Clarendon in Sydney 757Dec 13, 2010 7:08 pm Hey John. We also got rid of the "library" for a bed 4 robe. We did it a little different though. Can I ask was there a reason for putting the Alfresco on the opposite to the kitchen? Most have it the other way. Also, your bath vanity is a double bowl. So is ours but yours looks like you have the extra cupboard in between. What did C charge for that? Ours was $790 each. We upgraded both bath and ensuite vanity. For all your joinery needs, we custom build kitchens, office, wardrobes, garage, laundry fit outs plus TV units, pantry, linen and everything in between. PM me for more info or details. Re: Building the Waterfall by Clarendon in Sydney 758Dec 13, 2010 7:10 pm Hi Folks, Many thanks for your comments. It fills me with confidence that I am not asking for anything new- which I found hard to believe was the case. Have a great festive period. Re: Building the Waterfall by Clarendon in Sydney 759Dec 13, 2010 8:26 pm infocus Hey John. We also got rid of the "library" for a bed 4 robe. We did it a little different though. Can I ask was there a reason for putting the Alfresco on the opposite to the kitchen? Most have it the other way. Also, your bath vanity is a double bowl. So is ours but yours looks like you have the extra cupboard in between. What did C charge for that? Ours was $790 each. We upgraded both bath and ensuite vanity. Hi The alfresco was put on that side because of the awkward slope on our block, it would have had quite a drop otherwise, we already have a 500mm step down just past the garage to the back of the house (split level) but we get 3m high ceilings for the study,media and kitchen areas... I thought I just swapped the double sink from our ensuite to the main bathroom, but it turns out it cost me $800 for the extra sink and cupboard. ~Faulty memory... How did you get rid of the library Nook??, that was the only thing that bugged me about the design.. Cheers john Deposit paid 1/12/2009 Contracts signed 28/4/2010 Slab laid 25/7 Frame started 16/8 Plumbing 26/8 Brickwork finished 11/10 Roof tiled 20/10 Guttering 28/10 Wet Areas 30/11 Electrical roughing in 31/11 Insulation 8/12 Gyprock 9/12 Stairs installed 14/12 Doors and architraves installed 16/12 Lockup 17/12 Re: Building the Waterfall by Clarendon in Sydney 760Dec 13, 2010 8:46 pm So did yours actually come with a double bowl as standard in the ensuite? Thought I'd upload our plan to show what we did. Easier then explaining. We wanted to get rid of the library as it would have been a waste for us so like you turned it into a robe for bed 4. But as we upgraded our built in doors to mirrors for free (with a lot of arguing), we didn't want to lose them in bed 4 so opted for this design. Other things we did: Remove bed 5 and make the WIR larger and have a study nook upstairs for the kids to keep them away from my office downstairs. Utilise the droppers in Bed 1 by adding a bulkhead above. I will build a dresser in between. Widened the square set opening to meals to 1800mm and wrapped the first 2 steps around. Also moved the stack waste in the pantry to just outide it. Gives an extra foot or so in the Pantry. Plus other bits and pieces. It's hard to stop when you just keep finding things you'd like to do. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ For all your joinery needs, we custom build kitchens, office, wardrobes, garage, laundry fit outs plus TV units, pantry, linen and everything in between. PM me for more info or details. It is Genneral stairs, but they won't deal with anyone off the street. They will only work with clients of project home builders. I tried to but some of these exact… 3 9191 The two 15mm holes are obviously not compliant. The Dept of Fair Trading would love to see this one! Do the gutters pool water after it stops raining? Although it's… 4 8907 No idea about the driveway question, but your price for a house that size including landscaping seems very good! 1 6653 |