Browse Forums Building A New House Re: Porter Davis homes 582Nov 23, 2010 9:12 am Initial Deposit 05/09/2010 Tender 21/10/2010 Contract 26/11/2010 Site Start 11 Feb Bricking underway 28/03 Fitout commenced 20/04 PCI 08/07 Settlement 15/07 build Blog http://foxley29.blogspot.com/ Re: Porter Davis homes 586Nov 23, 2010 10:59 am __________________________________________ Built Camberwell 29 with PD - Hand Over was on 22/12/10 http://ssazcamberwell29.blogspot.com/ Re: Porter Davis homes 588Nov 23, 2010 11:05 am __________________________________________ Built Camberwell 29 with PD - Hand Over was on 22/12/10 http://ssazcamberwell29.blogspot.com/ Re: Porter Davis homes 589Nov 23, 2010 11:07 am __________________________________________ Built Camberwell 29 with PD - Hand Over was on 22/12/10 http://ssazcamberwell29.blogspot.com/ Re: Porter Davis homes 591Nov 23, 2010 11:49 am Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 593Nov 23, 2010 12:16 pm __________________________________________ Built Camberwell 29 with PD - Hand Over was on 22/12/10 http://ssazcamberwell29.blogspot.com/ Re: Porter Davis homes 594Nov 23, 2010 12:18 pm Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 598Nov 23, 2010 2:16 pm __________________________________________ Built Camberwell 29 with PD - Hand Over was on 22/12/10 http://ssazcamberwell29.blogspot.com/ Re: Porter Davis homes 600Nov 23, 2010 2:41 pm Hi SSAZ, Many thanks for pointing out the pre-plaster stage inspection. Actually that’s what in my mind, but in the PD Procedure of Purchase there is no stage as such, as it is specified as Lock up after the frame stage. After the frame stage I hope the builder would start the facia, gutter, roof tiling, bricking & the inside work. If I would interest in using an inspector for the pre-plaster stage could you please let me know at which time do I need to hire. Cheers.. Porter Davis - Wembley 35 Contract Signed: 17 Aug 2010 Handover: 12 Aug 2011 Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report 3 12336 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 74701 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 105551 |