Browse Forums Building Standards; Getting It Right! Re: cosmopolitan homes finishing quality 4Aug 04, 2010 10:30 am Hi Fisser, we are also building with Cosmo (Aquarius 23). Just paid the fee to draw up plans. If cosmo have so much work on, im a bit concerned that they will need to rush through their workload to meet demand, potentially affecting the quality of the finish. Hows your home going ? Re: cosmopolitan homes finishing quality 5Aug 04, 2010 12:57 pm Jacobs Hi Fisser, we are also building with Cosmo (Aquarius 23). Just paid the fee to draw up plans. If cosmo have so much work on, im a bit concerned that they will need to rush through their workload to meet demand, potentially affecting the quality of the finish. Hows your home going ? I suspect the reason Cosmopolitan Homes have so much work is because they put quality before time. Demolition August 2009, Construction Started September 2009, Completed December 2010 Re: cosmopolitan homes finishing quality 6Aug 17, 2010 3:03 pm Cosmo built our home at Spring Fram. When we look back, the tender process was little bit on the slow side. Then leading into the PCI stage, we feel they took little bit more than we expected. But we are very impressed with their build quality. We have nothing bad to say! Even our inspection dude couldn't find anything else during the PCI apart from that odd paint marks on the walls. We really did enjoy dealing with Cosmo. My sister is also building with EB and we did notice the difference between the two builders. I should say we didn't have to pay more than a cent outside the tender. We highly recommend them! Re: cosmopolitan homes finishing quality 7Jun 03, 2011 4:13 pm Hi, We are thinking of building with Cosmopolitan in Nelsons Ridge due to their present in the area. We spoke to their sales guy couple of times in New Roushill office and found him really helpful and knowledgable. We are looking at building Northcliff 30, we are happy with the design and everything. Plus cosmo is also giving us fixed price quote which includes, lights, drive ways, all the floorings (tiles downstaris & carpet upstairs), blinds, solar system. So we pretty much have to move in once they are finished. Only the front fencing and landscaping is not covered. For me and my wife, we don’t have much knowledge of building process so we thought this is good if they do cover everything in fixed price. However, one thing we don’t like about Cosmo is their Fascade for Northcliff. They only have one fascade and it is also in the picture, not on display. We don’t like that fascade. Did anyone had this type of issues, and how did they overcome from it? Re: cosmopolitan homes finishing quality 8Jun 03, 2011 10:51 pm We're only up to brick stage so can't comment on build quality. We have a 33 week build time (they tacked on an extra 5 days for Easter) so should be able to answer this by Christmas. Land at Chermside At tender stage Re: cosmopolitan homes finishing quality 9Jun 04, 2011 10:35 am jigarjan Hi, We are thinking of building with Cosmopolitan in Nelsons Ridge due to their present in the area. We spoke to their sales guy couple of times in New Roushill office and found him really helpful and knowledgable. We are looking at building Northcliff 30, we are happy with the design and everything. Plus cosmo is also giving us fixed price quote which includes, lights, drive ways, all the floorings (tiles downstaris & carpet upstairs), blinds, solar system. So we pretty much have to move in once they are finished. Only the front fencing and landscaping is not covered. For me and my wife, we don’t have much knowledge of building process so we thought this is good if they do cover everything in fixed price. However, one thing we don’t like about Cosmo is their Fascade for Northcliff. They only have one fascade and it is also in the picture, not on display. We don’t like that fascade. Did anyone had this type of issues, and how did they overcome from it? I'm sure an alternative fascade could be organised. If they only have one fascade you'd be doing yourself and Cosmopolitan Homes a favour. Demolition August 2009, Construction Started September 2009, Completed December 2010 Get an independent building inspection done now. Once handover is done, if they didn't fix it beforehand its doubtful they ever will. Get someone independent from them,… 17 21861 It's MGP 10 which means every length has been machine graded to it's specified engineered strength. It may not look pretty and if you where hand picking your timbers you… 1 6503 Looks like AllCastle Homes. The door frames and brick colour give it away to me at least. My last home was built by AllCastle and my current neighbour's is, they were good… 3 10644 |