Browse Forums Building A New House Re: netadelle's build - Plantation Shutters painted & instal 323Jun 02, 2010 4:21 pm my new build thread- Ben Trager https://forum.homeone.com.au/viewtopic.php?f=31&t=89826 my switch build thread (2011) https://forum.homeone.com.au/viewtopic.php?f=31&t=36569 Re: netadelle's build - Plantation Shutters painted & instal 324Jun 02, 2010 5:18 pm Henley - Wilshire Mk 3 ... I love my house!! Site start: 4th Feb 09 Handover: 10th Sep 09 Blog: http://stormygirlscastle.blogspot.com/ Build Thread: viewtopic.php?t=7166 Re: netadelle's build - Plantation Shutters painted & instal 327Jun 02, 2010 9:25 pm Building an Eden Brae Saville 27 http://karry327.blogspot.com/ Building thread https://forum.homeone.com.au/viewtopic.php?f=31&t=44247 Re: netadelle's build - Plantation Shutters painted & instal 331Jun 04, 2010 8:56 pm Henley - Wilshire Mk 3 ... I love my house!! Site start: 4th Feb 09 Handover: 10th Sep 09 Blog: http://stormygirlscastle.blogspot.com/ Build Thread: viewtopic.php?t=7166 Re: netadelle's build - Plantation Shutters painted & instal 332Jun 04, 2010 10:18 pm Such a marvelous effort with the plantation shutters. I got tired from just looking at them laid out during the painting process. They look awesome! Re: netadelle's build - Plantation Shutters painted & instal 333Jun 05, 2010 8:23 am stormy ,we have a similar sized stacker door in the family and 2 fixed windows to the right with the fireplace in the middle. the 2 fixed windows will have plantation shutters. That was my concern too ,when the plantation sliders are fully open it will cover the fixed window to the right. Into blinds assured me instead of 3 panels ,like the stacker door ,the plantation will have 2 he didnt mention anything about a pelmet, the plantation will run on a slider on the floor. We also looked at curtains,Romans for that door but it just doesnt sit well as the plantation shutter. By the way the plantation shutter will cost me $3800.00 with a 1 year warranty. will post a photo soon Re: netadelle's build - Plantation Shutters painted & instal 334Jun 05, 2010 8:41 am Those shutters look wonderful. Well done on doing them yourself and good on you for passing on the roller tip to save anyone else the same headache. Re: netadelle's build - Plantation Shutters painted & instal 335Jun 05, 2010 10:32 am Great job, Netadelle! After seeing all that timber and multiplying it by the extra bedroom windows we have (not to mention the awkward corner window), I'm so not doing it myself though....think I'll just save up my money. They look fabulous though. Re: netadelle's build - Plantation Shutters painted & instal 336Jun 07, 2010 8:21 pm http://img34.imageshack.us/img34/4637/p1000120v.jpg http://img218.imageshack.us/img218/1047/p1000121g.jpg the pictures I promised . Into blinds in melbourne will be assesing the large stacker door for the best options. Iam hoping its going to work and the shutters wont intrude too much into the fixed window on the left Re: netadelle's build - Plantation Shutters painted & instal 337Jun 07, 2010 10:53 pm Shutters look absolutely amazing - great work done by you both! I might have to look at the site, they look great! How are they for keeping the light out? Our home: viewtopic.php?f=31&t=29960 Re: netadelle's build - Plantation Shutters painted & instal 338Jun 08, 2010 8:34 am Shutters look awesome!! You have inspired us to look into doing them ourselves!! Your house looks fantastic Building the Saville27 in Kellyville Ridge Floor tiles done Port-A-loo Gone Site Fence Gone Electrical Done House Cleaned Driveway Done WE'RE IN! http://ebsaville.blogspot.com Re: netadelle's build - Plantation Shutters painted & instal 339Jun 16, 2010 3:38 pm Thanks for all your comments I wake up every morning and still love them DoubleB Shutters look absolutely amazing - great work done by you both! I might have to look at the site, they look great! How are they for keeping the light out? They don't keep all the light out, but the room is still dark enough during the day to the be able to sleep in there. Saville27 Shutters look awesome!! You have inspired us to look into doing them ourselves!! Your house looks fantastic excellent! The painting isn't hard, just time consuming! We arn't going to paint the ones that are going in the front two rooms now, we've had a friend come give us some advice on the front garden, we are going to put a big deck out the front door, so we will leave the shutters in the front two rooms natural and let the wood go 'grey' along with the decking out the front. Will show some design pictures when he comes up with them I can't wait to be able to afford to get the shutters for the bathrooms! Re: netadelle's build - 3 month maintenance 340Jun 16, 2010 3:48 pm We have moved out of a rental and into our new home. The owner of the last rental has been a bit nutso and tried to claim almost our full bond back from us for the stupidest tiniest things. So I think I went a bit overboard and nit picking with our maintence list. I was scared I wasn't going to met the deadline if I posted it in, so I emailed it to there maintence email address. I got a response in about 5 minutes that they had assigned it to there maintence person. That person called about an hour later and we set a date for two days time for the guy to come out and address our issues. I thought he would tell me I was being stupid and wouldn't do half of it, but he did every nit picking little thing on the list!! Including sanding the bits of roller fluff of the walls and repainting! He did however say he had never seen a list quite like it before!! So here is the list: Laundry – internal door needs sand and repair as per the Handover Items requiring attention form Laundry – internal window frame needs sand and repaint as per the Handover items requiring attention form Laundry – external door lip where tiles are, cement/mortar holding the tiles on has fallen/broken off Laundry – paint top and bottom of Internal and External laundry door Laundry – Internal door only has one coat of paint on one side Verandah – Chipped tile Verandah – White film on tiles that I can’t clean off External – Clean mess made from installation of Water Heater Entrance – Front door, external paint job is splotchy can see undercoat in places Entrance – Front door needs top and bottom of door painted Entrance – hole/chipped plasterboard that adjoins front door frame on the inside Entrance – Front door doesn’t latch easily, needs to be pushed very hard to latch, locking mechanism is very stiff and hard to lock and unlock Bed 1 – two holes in ceiling, looks like nail has gone through, ceiling plasterboard is sagging Bed 1 – Robe - Chips in centre edge of laminate on either end of RHS shelf Bed 1 – Bubbles of paint have dried and burst and flaked off on the window sill Ensuite – Chipped floor tile in shower recess Ensuite – Chipped wall tile in shower recess Ensuite – Hair sticking out from grout in shower recess Ensuite – Can’t clean cement off grate in floor Ensuite – Door not painted top and bottom Ensuite – Door missing second coat of paint on one side Ensuite – Gouges in door just above latching mechanism, that have been painted over Hallway – blobs like from a degrading paint roller stuck on wall near Bed 1 door Kitchen – Pantry – Chips on end of every shelf in centre Kitchen – hole in bottom of door leading to garage Kitchen – splashback tiles on corner – the ends are painted on 2 the other 5 are not Meals – Sliding door frame chipped and dented from where bricklayers ran wheel barrow over it Rumpus – chips in window frame LHS Bathroom – hole in grout behind sink in bathroom Bathroom – Door not painted top and bottom Bathroom – Door has gouges above locking mechanism that has just been painted over Bathroom – white film on tile near shower recess that won’t clean off Bathroom – holes in grout in shower recess Bathroom – chips in wall tiles in shower recess Bathroom – Hole in silicon/grout around basin Bathroom – badly painted over patch job on window sill Bathroom – sharp tile edges on bath hob – tile layout needed a little more thought , my children have cut themselves on these tiles Toilet – 4 marks on back of door at even height from top and bottom Toilet – door not painted top and bottom Toilet – chips on window frame Doors – ALL internal doors are missing a 2nd coat of paint on one side Doors – All doors to wet area are missing required paint on top and bottom to seal them Paint – bits of roller left in the paint throughout the house, these need to be knocked off and patched Ensuite – silicon beading around top of tiles in shower recess where it meets the ceiling as per the Handover items requiring attention form Bathroom – cold tap drips, have to turn it really really hard to turn it off All the tiling stuff has been referred back to North Adelaide tiling, so I have to wait for them to call and send someone out. All in all the maintence guy had to come back 3 times to get it all done. But he did every thing that I listed (minus the tiling stuff). Including painting all the doors! Thank you so much everyone. This all makes a lot of sense. I guess when you talk to a builder who butters up everything to look very polished, you get to start believing… 7 18357 Render your bathroom walls, two opinions versus the one, makes you wonder. 3 6124 Hi Geoff Install Puddle Flange prior to any screed. Puddle flange needs to be flush with the surface so you may need to grind away the surface to achieve this. Also as… 2 8414 |