Browse Forums Building A New House Re: Above bench basin complications 2Jan 14, 2021 9:06 pm Accessible Carpentry & Cabinets accessiblecarpentry@gmail.com accessiblecarpentry.com.au https://www.facebook.com/pages/Accessible-Carpentry-Cabinets/583314911709039 Re: Above bench basin complications 4Jan 14, 2021 9:27 pm Accessible Carpentry & Cabinets accessiblecarpentry@gmail.com accessiblecarpentry.com.au https://www.facebook.com/pages/Accessible-Carpentry-Cabinets/583314911709039 Re: Above bench basin complications 5Jan 14, 2021 9:28 pm Accessible Carpentry & Cabinets accessiblecarpentry@gmail.com accessiblecarpentry.com.au https://www.facebook.com/pages/Accessible-Carpentry-Cabinets/583314911709039 Re: Above bench basin complications 6Jan 14, 2021 9:29 pm chippy Tell the builder to grade the floor all back to the strip drain in the shower. That can be the floor waste for the entire bathroom as there is no job to stop the flow of water. Just waterproof the whole bathroom floor. Awesome, thank you. Sounds like it’s not as catastrophic as it might have been explained to us today?? Re: Above bench basin complications 7Jan 14, 2021 9:32 pm Winnieshome chippy Tell the builder to grade the floor all back to the strip drain in the shower. That can be the floor waste for the entire bathroom as there is no job to stop the flow of water. Just waterproof the whole bathroom floor. Awesome, thank you. Sounds like it’s not as catastrophic as it might have been explained to us today?? No overflow on our basins. It's easy done. Just depends on how accommodating your builder is. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Accessible Carpentry & Cabinets accessiblecarpentry@gmail.com accessiblecarpentry.com.au https://www.facebook.com/pages/Accessible-Carpentry-Cabinets/583314911709039 Re: Above bench basin complications 8Jan 14, 2021 9:39 pm chippy Winnieshome chippy Tell the builder to grade the floor all back to the strip drain in the shower. That can be the floor waste for the entire bathroom as there is no job to stop the flow of water. Just waterproof the whole bathroom floor. Awesome, thank you. Sounds like it’s not as catastrophic as it might have been explained to us today?? No overflow on our basins. It's easy done. Just depends on how accommodating your builder is. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ That’s great. Thanks so much for taking the time to share. Sounds like it should be a reasonably straight forward convo with our builder. Nice bathroom! Thanks for sharing. Looks good. The joiner has come back with a quote of close to 5k. I think we are going to not do it. Attaching panelling is something they are dead… 11 10080 Have look at your house plans and you will probably find that brick articulation joint has been missed. Maximum allowable spacing is 6M or 5.5M for a wall with window… 17 16636 Hi everyone, Looking for some advise. We are about to build an above ground pool in our backyard. There is a private sewer line running under the pool at 1.6m… 0 7959 |