Browse Forums Building A New House Re: Above bench basin complications 2Jan 14, 2021 8:06 pm Accessible Carpentry & Cabinets accessiblecarpentry@gmail.com accessiblecarpentry.com.au https://www.facebook.com/pages/Accessible-Carpentry-Cabinets/583314911709039 Re: Above bench basin complications 4Jan 14, 2021 8:27 pm Tell the builder to grade the floor all back to the strip drain in the shower. That can be the floor waste for the entire bathroom as there is no job to stop the flow of water. Just waterproof the whole bathroom floor. Accessible Carpentry & Cabinets accessiblecarpentry@gmail.com accessiblecarpentry.com.au https://www.facebook.com/pages/Accessible-Carpentry-Cabinets/583314911709039 Re: Above bench basin complications 5Jan 14, 2021 8:28 pm No hob. The builder will have to do a nice step down in the slab to get the grade but it doesn't cost anything. Accessible Carpentry & Cabinets accessiblecarpentry@gmail.com accessiblecarpentry.com.au https://www.facebook.com/pages/Accessible-Carpentry-Cabinets/583314911709039 Re: Above bench basin complications 6Jan 14, 2021 8:29 pm chippy Tell the builder to grade the floor all back to the strip drain in the shower. That can be the floor waste for the entire bathroom as there is no job to stop the flow of water. Just waterproof the whole bathroom floor. Awesome, thank you. Sounds like it’s not as catastrophic as it might have been explained to us today?? Re: Above bench basin complications 7Jan 14, 2021 8:32 pm Winnieshome chippy Tell the builder to grade the floor all back to the strip drain in the shower. That can be the floor waste for the entire bathroom as there is no job to stop the flow of water. Just waterproof the whole bathroom floor. Awesome, thank you. Sounds like it’s not as catastrophic as it might have been explained to us today?? No overflow on our basins. It's easy done. Just depends on how accommodating your builder is. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Accessible Carpentry & Cabinets accessiblecarpentry@gmail.com accessiblecarpentry.com.au https://www.facebook.com/pages/Accessible-Carpentry-Cabinets/583314911709039 Re: Above bench basin complications 8Jan 14, 2021 8:39 pm chippy Winnieshome chippy Tell the builder to grade the floor all back to the strip drain in the shower. That can be the floor waste for the entire bathroom as there is no job to stop the flow of water. Just waterproof the whole bathroom floor. Awesome, thank you. Sounds like it’s not as catastrophic as it might have been explained to us today?? No overflow on our basins. It's easy done. Just depends on how accommodating your builder is. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ That’s great. Thanks so much for taking the time to share. Sounds like it should be a reasonably straight forward convo with our builder. Nice bathroom! Have look at your house plans and you will probably find that brick articulation joint has been missed. Maximum allowable spacing is 6M or 5.5M for a wall with window… 17 20522 Hi everyone, Looking for some advise. We are about to build an above ground pool in our backyard. There is a private sewer line running under the pool at 1.6m… 0 11689 You can really use anything you want the main consideration would be how it looks once painted/finished - or the look you want. Cabinetmakers use MDF because its cheap… 2 9900 |