What stage are you up to? Have you submitted to CDC?
Yes it was been submitted (was told in Dec) but there were continuous modifications and rejections all through out Feb - May and still not back to us with approved stamp on it.
Browse Forums Building A New House Re: Building with Wisdom Homes 15852Jun 16, 2020 9:45 pm Accessible Carpentry & Cabinets accessiblecarpentry@gmail.com accessiblecarpentry.com.au https://www.facebook.com/pages/Accessible-Carpentry-Cabinets/583314911709039 Re: Building with Wisdom Homes 15856Jun 21, 2020 6:37 am nickmutch your comment on 20.06.2020 does not seem right to me;
“Yeah build time was around 11 months, works really slowed in late Nov as we had completed brick and were almost at lock up however as installed solar + tesla which delayed the rest of the sequence“. How could these 2 items delay your build? These are both external items that are Installed on the roof and side of your house, and should not affect the other construction items or the sequence. They can be installed anytime after the walls and roof are finished. Ideally, the Tesla battery may be as late as possible due to risk of theft - like Wisdom's contract policy for kitchen appliances installation after handover. What did Wisdom Homes advise you in justifying this questionable delay? I assume renting in the bayside area costs about $1,000 per week, which is not insignificant. What liquidated damages amount, as some compensation for Wisdom Homes' delays, will you be able offset against your final invoice? Re: Building with Wisdom Homes 15857Jun 21, 2020 6:49 am champs2018 We finally got our keys..but after living for 24hrs we have found that the floor makes queaky noise when we walk on the top floor..does this happen with everyone?? It feels like the wood between the floors is weak n makes weird noise that its very annoying to anyone in ground floor..could this be reported as a finding in maintenance period or is it something that can't be fixed? Can definitely be fixed in maintenance. They will fix squeaky floors for 2 years. Re: Building with Wisdom Homes 15858Jun 21, 2020 2:30 pm Manhattan52 champs2018 We finally got our keys..but after living for 24hrs we have found that the floor makes queaky noise when we walk on the top floor..does this happen with everyone?? It feels like the wood between the floors is weak n makes weird noise that its very annoying to anyone in ground floor..could this be reported as a finding in maintenance period or is it something that can't be fixed? Can definitely be fixed in maintenance. They will fix squeaky floors for 2 years. Manhattan52 why is fixing squeaky floors different to other items in Wisdom Homes maintenance period, which expires after 90 days? Is this a special condition written into their contracts? What are some other common issues that you are aware that Wisdom will fix up to 2 years from handover? This may be of interest to many clients who have recently built with Wisdom. Re: Building with Wisdom Homes 15859Jun 21, 2020 2:48 pm champs2018 We finally got our keys..but after living for 24hrs we have found that the floor makes queaky noise when we walk on the top floor..does this happen with everyone?? It feels like the wood between the floors is weak n makes weird noise that its very annoying to anyone in ground floor..could this be reported as a finding in maintenance period or is it something that can't be fixed? How come this was no picked during PCI? I had something similar in a section upstairs but was picked up just before PCI by my SS and was fixed before PCI inspection. You don’t have to wait or include in 90 days list. Contact WH straightway and asked you want it fixed as soon as possible. Only use the 90 days list for minor touch up issues. Re: Building with Wisdom Homes 15860Jun 21, 2020 3:04 pm Norfolk Manhattan52 champs2018 We finally got our keys..but after living for 24hrs we have found that the floor makes queaky noise when we walk on the top floor..does this happen with everyone?? It feels like the wood between the floors is weak n makes weird noise that its very annoying to anyone in ground floor..could this be reported as a finding in maintenance period or is it something that can't be fixed? Can definitely be fixed in maintenance. They will fix squeaky floors for 2 years. Manhattan52 why is fixing squeaky floors different to other items in Wisdom Homes maintenance period, which expires after 90 days? Is this a special condition written into their contracts? What are some other common issues that you are aware that Wisdom will fix up to 2 years from handover? This may be of interest to many clients who have recently built with Wisdom. The maintenance period doesn’t expire after 90 days. The 90 day period is when they ask you submit your list, however you can do this at any time during the 90 days All non structural items will be fixed for 2 years. Floors can creak/squeak seasonally dependant on weather Can someone please offer some advice? Im DESPERATE. Because I'm completely and utterly exhausted. How long are variations taking with other companies at the moment? We… 0 19046 In fairness nobody gave a crap about the ACCC and the gag clauses continued in the pro forma templates of a few other builders after the ACCC took on Wisdom, and more… 19 74164 Hi Everyone, I am exploring builder in NSW and received a very tempting quote from Wisdom home for their momentum series. I just want to know experience of building… 0 9488 |