Browse Forums DIY, Home Maintenance & Repair Re: Pond built up over slab 2Jan 08, 2020 12:12 am 3in1 Supadiverta. Rainwater Harvesting Best Practice using syphonic drainage. Cleaner Neater Smarter Cheaper Supa Gutter Pumper. A low cost syphonic eaves gutter overflow solution. Re: Pond built up over slab 3Jan 08, 2020 8:47 am Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Pond built up over slab 6Jan 09, 2020 8:53 am Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Pond built up over slab 8Jan 09, 2020 9:19 am Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Pond built up over slab 11Feb 03, 2020 7:44 am Your damp course is in the brickwork and even if you can't see it it should be level with bottom of weep holes. Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Weep Holes (edit) 12Mar 01, 2020 10:03 am Update: What if there are no weep holes? This entire wall (and another) have filled in vents but I cannot see a single weep hole anywhere (covered up or not). Further to that, the bricks are well damaged at the bottom, clearly from years of water damage - should this be of concern? Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ My daughter and son in law are about to start building, they are having a 600mm induction cook top and 900mm oven. It's personal preferance 5 11405 One corner of my shed slab will be directly over a 1400mm diameter concrete soakwell. Is it feasible to fill the soakwell with concrete then lay the shed slab over the… 0 676 The Soil classification has little to do with piers. The purpose of the classing of the soil is to identify the clay content and the "average expected range of movement… 2 9908 |