Browse Forums Building A New House Re: Building with MOMU @ Duncraig 12Nov 11, 2019 4:00 pm Finally I got a call today from my Construction Manager today that the slab will be laid this week. That was such a relief, considering the fact that the PoP was signed with MOMU on 10th of July. Meanwhile my neighbours, who's lot titled on the same day as mine, have their roof frame up. Let's hope there are no further holdups. Using SweetHome3D for my designs.... Re: Building with MOMU @ Duncraig 13Nov 11, 2019 4:27 pm One thing to be aware of with your pantry opening into and backing onto the garage is that your pantry could get quite warm with potential impact on shelf life of food items External garage walls and the ones between garage and house are generally only single brick so heat transfer can be an issue. Maybe consider insulation on the garage side of the wall? Re: Building with MOMU @ Duncraig 14Nov 11, 2019 5:06 pm Althom One thing to be aware of with your pantry opening into and backing onto the garage is that your pantry could get quite warm with potential impact on shelf life of food items External garage walls and the ones between garage and house are generally only single brick so heat transfer can be an issue. Maybe consider insulation on the garage side of the wall? That's a good pickup mate. However I can confirm that this particular wall is a double wall. Using SweetHome3D for my designs.... Re: Building with MOMU @ Duncraig 17Nov 12, 2019 12:47 pm Bobjane Happy that your house is up to the next stage I have pre-start coming up this week. By any chance do you remember how long it took from finishing pre-start until the slab stage? Hi Bobjain, I signed my PoP on 10th July. The slab is going to be laid this week. That would be about 18 weeks. Using SweetHome3D for my designs.... Re: Building with MOMU @ Duncraig 18Jan 01, 2020 2:38 pm Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Finally some progress... The slab was poured. However then the crew went on their Christmas break. Hopefully they start the brickwork by mid-Jan, as promised. I did see that the slab was out of measurement at couple of places by upto 300mm. Is that a concern, or they manage it in some form in the latter stages? Using SweetHome3D for my designs.... Re: Building with MOMU @ Duncraig 20Jan 01, 2020 5:04 pm amilelka The slab only reaches as far as the internal leaf of brickwork. The external leaf of brickwork sits on the footing below it. Did you take this into consideration when making your measurements? Thanks amilelka, but I referred to the plan for the slab only. Even going by your information, all sides should have been less than the plan dimensions, not just those 2 edges. I'll have to take it up with my builder when they open after Christmas. Using SweetHome3D for my designs.... I’m curious about how you went with this. We are planning a KDRB and considering Plantation Homes as a builder. I’m aware that after the demolition another soil test… 1 6326 i wouldn't be worried, you'll definitely miss something, no matter how many times you review. we've spent close to 5 months ensuring everything got reflected in the… 5 9453 Thanks for your reply. I will just wait and see I guess. Trying to get some more information from our builder. 9 11731 |