Browse Forums Building A New House Re: KDR Vantage Mode facade modified 71Oct 20, 2019 12:42 am EricHong Looks good, at least some progress. We are also going to build a Vantage with Metricon, currently in contract stage. Do you have Hebel powerfloor (as the subfloor)? Metricon says that they are using steel joints (the frame is still timber); is that the case with your build? Cheers. Re: KDR Vantage Mode facade modified 72Oct 20, 2019 10:00 am Macher EricHong Looks good, at least some progress. We are also going to build a Vantage with Metricon, currently in contract stage. Do you have Hebel powerfloor (as the subfloor)? Metricon says that they are using steel joints (the frame is still timber); is that the case with your build? Cheers. Hi, we did not go with the hebel floor as at my contract stage I heard it was really expensive. However since then I have heard that M has got better deals with supplier and passing it on to customer. So.. I wished I had hebel floors. We have identified creaking noises and tried our best to have ss rectify. However plaster is on now, and it makes it a little harder to rectify. We still hear creaking in some areas. I would love to hear from Stanus if the power floor was worth it. I will ask him in his feed. Thanks, Macher. Hope M will sort this out for you. Other than the subfloor, the creaking may come from joists sa well. That's why I am a little bit concerned about the steel joints M will use under the Hebel subfloor. Hebel powerfloor is still quite expensive, about 21k for about 190sqm. Re: KDR Vantage Mode facade modified 73Oct 20, 2019 12:30 pm EricHong Looks good, at least some progress. We are also going to build a Vantage with Metricon, currently in contract stage. Do you have Hebel powerfloor (as the subfloor)? Metricon says that they are using steel joints (the frame is still timber); is that the case with your build? Cheers. Re: KDR Vantage Mode facade modified 74Oct 20, 2019 7:59 pm Status said it was the best decision he made. $21k sounds like alot. We have spent over $8k on additional accounstic insulation and plan to spend over $1.5k on upgrading carpets and underlay post handover. At the moment, without carpets we can still hear walking (not creaking) from upstairs so maybe $21k would have given us peace of mind. Re: KDR Vantage Mode facade modified 75Oct 21, 2019 4:15 pm Macher Status said it was the best decision he made. $21k sounds like alot. We have spent over $8k on additional accounstic insulation and plan to spend over $1.5k on upgrading carpets and underlay post handover. At the moment, without carpets we can still hear walking (not creaking) from upstairs so maybe $21k would have given us peace of mind. Thanks mate. Yes, I have chosen the Hebel subfloor, tiles to ceiling for all bathrooms, brick external walls, and 2.7m ceiling height for both floors, etc..., which bring the total price to 700k+ for Vantage 48. Re: KDR Vantage Mode facade modified 76Oct 21, 2019 4:17 pm Renman EricHong Looks good, at least some progress. We are also going to build a Vantage with Metricon, currently in contract stage. Do you have Hebel powerfloor (as the subfloor)? Metricon says that they are using steel joints (the frame is still timber); is that the case with your build? Cheers. Recommend U get the power floors. We couldn't get it with some major changes to the design. Regret not doing it now. Thanks, Renman. We do get the Hebel power floors as I couldn't image the floor upon some particle boards. Re: KDR Vantage Mode facade modified 77Oct 21, 2019 6:39 pm EricHong Macher Status said it was the best decision he made. $21k sounds like alot. We have spent over $8k on additional accounstic insulation and plan to spend over $1.5k on upgrading carpets and underlay post handover. At the moment, without carpets we can still hear walking (not creaking) from upstairs so maybe $21k would have given us peace of mind. Thanks mate. Yes, I have chosen the Hebel subfloor, tiles to ceiling for all bathrooms, brick external walls, and 2.7m ceiling height for both floors, etc..., which bring the total price to 700k+ for Vantage 48. One thing I also regret not doing is asking metricon to build a extra garage size unit at the rear. You can probably get one for $15k the size of 4 x 5m with a roller door and window pedestrian door and lights. This is bargan. It would be the ultimate man cave or retreat. Brick walls and tiles roof included in price. Re: KDR Vantage Mode facade modified 78Oct 22, 2019 9:41 am Macher EricHong Macher Status said it was the best decision he made. $21k sounds like alot. We have spent over $8k on additional accounstic insulation and plan to spend over $1.5k on upgrading carpets and underlay post handover. At the moment, without carpets we can still hear walking (not creaking) from upstairs so maybe $21k would have given us peace of mind. Thanks mate. Yes, I have chosen the Hebel subfloor, tiles to ceiling for all bathrooms, brick external walls, and 2.7m ceiling height for both floors, etc..., which bring the total price to 700k+ for Vantage 48. We spent around the same without hebel power floor. One thing I also regret not doing is asking metricon to build a extra garage size unit at the rear. You can probably get one for $15k the size of 4 x 5m with a roller door and window pedestrian door and lights. This is bargan. It would be the ultimate man cave or retreat. Brick walls and tiles roof included in price. Hi Macher, our brick shed is 6m x 4m with slab, power, lighting, swing door, window and roller door. $15,500 (excluding later upgrades for bricks and colorbond). Re: KDR Vantage Mode facade modified 79Oct 31, 2019 5:59 am Stairs partially installed and kitchen cabinets delivered. House is officially in lock up and probably expect hand over in march 2020. Still many issues with hebel installation as the guys have not been installing as per instruction on hebel Web site. SS is passing our concerns on to installers. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ 😃 will do an exclusive one for Simeon.. COVID back at home.. kept it simple & we moved in.. & yesterday was the first day at our new home.. Few more bits to go -… 4 25788 The biggest challenge will be if you take out a loan and then run out of money - you'll have an incomplete security and lenders do not like this so you can get stuck.… 2 20304 Hi, I am looking into doing a KDR in Melbourne and am contemplating using Kialla Homes. I am looking for feedback on them from others who have built with them. 0 14357 |