Browse Forums Building A New House Re: Building with Wisdom Homes 14752Jun 05, 2019 8:35 pm Athena Ninsta We upgraded also but for us the main reason was the included promotion model only had one temperature sensor whcih was in the keypad - building a 2 storey we wanted a sensor on each floor. Thats a good idea to have sensor on each floor. How many sensors do you get when you upgrade? Just 2? You can just pay for an extra control pad with the base model. Building Monte Carlo 40- Wisdom homes Re: Building with Wisdom Homes 14753Jun 05, 2019 10:23 pm MandM+4 Athena Ninsta We upgraded also but for us the main reason was the included promotion model only had one temperature sensor whcih was in the keypad - building a 2 storey we wanted a sensor on each floor. Thats a good idea to have sensor on each floor. How many sensors do you get when you upgrade? Just 2? You can just pay for an extra control pad with the base model. Yes you can. We are building a double storey and have a control pad upstairs. Re: Building with Wisdom Homes 14754Jun 06, 2019 10:49 am a few things to keep in mind as well. The ESP plus can step down the output so in theory can reduce the amount of electricity used. However, in order for it to step down it need to detect the room temp accurately. If you are having a controller(which contains the temp sensor) upstairs in the gallery, it will detect the temperature of the gallery but not the rooms, unless you leave all the room doors open. as an example, if you sleep in the main room and that's the only room you turn your aircon on (based on the zoning), having the controller out in the Gallery will detect a different temperature. We asked around because we were curious how the aircon can detect the right temp to step down the power as marketed and found it can not do this unless there is a sensor in each of the zones. (or you leave all the internal doors open effectively becoming the same zone) having said that, the esp plus is worth the upgrade. Extra zones and also the wifi module as standard. Re: Building with Wisdom Homes 14755Jun 06, 2019 10:59 am PeterJess a few things to keep in mind as well. The ESP plus can step down the output so in theory can reduce the amount of electricity used. However, in order for it to step down it need to detect the room temp accurately. If you are having a controller(which contains the temp sensor) upstairs in the gallery, it will detect the temperature of the gallery but not the rooms, unless you leave all the room doors open. as an example, if you sleep in the main room and that's the only room you turn your aircon on (based on the zoning), having the controller out in the Gallery will detect a different temperature. We asked around because we were curious how the aircon can detect the right temp to step down the power as marketed and found it can not do this unless there is a sensor in each of the zones. (or you leave all the internal doors open effectively becoming the same zone) having said that, the esp plus is worth the upgrade. Extra zones and also the wifi module as standard. Thank you Peter, for the detailed reply. I think we will upgrade the aircon. I guess we should be able to add more controllers later, but to start with we will have two controllers. Re: Building with Wisdom Homes 14756Jun 12, 2019 2:28 pm Hi guys, we are well into our build now - pre lining stage is probably in the next 2 weeks or so. Just wondering has anyone added something into their Electricals at this stage of their build? We have a provision in our Electrical Plan for a "future pendant light" in the stairs. I see the pendants i like on their Beacon Lighting list. I'm wondering if it's too late to add this... I would rather get it done with Wisdom now as it's one less thing i need to think about after handover since im getting that exact light anyway. Edited to add: i know they'll probably charge a Building Variation Fee for this right? Which makes the whole thing more expensive anyway Re: Building with Wisdom Homes 14757Jun 12, 2019 3:12 pm ASJ1981 Hi guys, we are well into our build now - pre lining stage is probably in the next 2 weeks or so. Just wondering has anyone added something into their Electricals at this stage of their build? We have a provision in our Electrical Plan for a "future pendant light" in the stairs. I see the pendants i like on their Beacon Lighting list. I'm wondering if it's too late to add this... I would rather get it done with Wisdom now as it's one less thing i need to think about after handover since im getting that exact light anyway. Edited to add: i know they'll probably charge a Building Variation Fee for this right? Which makes the whole thing more expensive anyway We did lots of changes to the electricals and also added solar and Tesla batteries etc. This caused the whole project to go on hold which is not ideal and we also have to pay a variation fee, think it’s around $1,500. If you’re going to make changes you might as well change a lot of things at the same time to get the most out of the variation fees. Cheers Re: Building with Wisdom Homes 14758Jun 12, 2019 3:15 pm Magnus ASJ1981 Hi guys, we are well into our build now - pre lining stage is probably in the next 2 weeks or so. Just wondering has anyone added something into their Electricals at this stage of their build? We have a provision in our Electrical Plan for a "future pendant light" in the stairs. I see the pendants i like on their Beacon Lighting list. I'm wondering if it's too late to add this... I would rather get it done with Wisdom now as it's one less thing i need to think about after handover since im getting that exact light anyway. Edited to add: i know they'll probably charge a Building Variation Fee for this right? Which makes the whole thing more expensive anyway We did lots of changes to the electricals and also added solar and Tesla batteries etc. This caused the whole project to go on hold which is not ideal and we also have to pay a variation fee, think it’s around $1,500. If you’re going to make changes you might as well change a lot of things at the same time to get the most out of the variation fees. Cheers Thank you for your reply magnus I just realised after posting, that it won't make sense for me to make 1 change and be charged $1500 for it. I'll just buy the pendant and install after handover. Re: Building with Wisdom Homes 14759Jun 12, 2019 9:13 pm Magnus ASJ1981 Hi guys, we are well into our build now - pre lining stage is probably in the next 2 weeks or so. Just wondering has anyone added something into their Electricals at this stage of their build? We have a provision in our Electrical Plan for a "future pendant light" in the stairs. I see the pendants i like on their Beacon Lighting list. I'm wondering if it's too late to add this... I would rather get it done with Wisdom now as it's one less thing i need to think about after handover since im getting that exact light anyway. Edited to add: i know they'll probably charge a Building Variation Fee for this right? Which makes the whole thing more expensive anyway We did lots of changes to the electricals and also added solar and Tesla batteries etc. This caused the whole project to go on hold which is not ideal and we also have to pay a variation fee, think it’s around $1,500. If you’re going to make changes you might as well change a lot of things at the same time to get the most out of the variation fees. Cheers Magnus. Where are you up to and how long did they stop for? Re: Building with Wisdom Homes 14760Jun 12, 2019 9:46 pm ASJ1981 Hi guys, we are well into our build now - pre lining stage is probably in the next 2 weeks or so. Just wondering has anyone added something into their Electricals at this stage of their build? We have a provision in our Electrical Plan for a "future pendant light" in the stairs. I see the pendants i like on their Beacon Lighting list. I'm wondering if it's too late to add this... I would rather get it done with Wisdom now as it's one less thing i need to think about after handover since im getting that exact light anyway. Edited to add: i know they'll probably charge a Building Variation Fee for this right? Which makes the whole thing more expensive anyway Just ask your SS. It’s not exactly more work for them if they’re putting a batten light there anyway, he might do you a favour. When we built W didn’t offer the pedants from beacon, we had to do after handover and it was a bit of a pain to access above the stairs. Still wouldn’t pay a variation fee but it’s worth the ask. Building Monte Carlo 40- Wisdom homes Can someone please offer some advice? Im DESPERATE. Because I'm completely and utterly exhausted. How long are variations taking with other companies at the moment? We… 0 18470 In fairness nobody gave a crap about the ACCC and the gag clauses continued in the pro forma templates of a few other builders after the ACCC took on Wisdom, and more… 19 73480 Hi Everyone, I am exploring builder in NSW and received a very tempting quote from Wisdom home for their momentum series. I just want to know experience of building… 0 8240 |