Browse Forums Building A New House Re: Madison 35 by Clarendon Homes - enclosed stage 113May 10, 2019 8:07 am Follow Our Clarendon - Double Gable, Hamptons Inspired Fairmont 35 https://forum.homeone.com.au/viewtopic.php?f=31&t=94604 Re: Madison 35 by Clarendon Homes - enclosed stage 115May 10, 2019 1:44 pm Follow Our Clarendon - Double Gable, Hamptons Inspired Fairmont 35 https://forum.homeone.com.au/viewtopic.php?f=31&t=94604 Re: Madison 35 by Clarendon Homes - Fixing stage 118May 11, 2019 4:07 pm Update for this week: We spent the morning at the block - there were 3.5 pallets of bricks surplus at the end... Seeing a purpose for them, we transported a couple of car loads away to be stored elsewhere. Even with that chunk of work, there are still 2 full pallets left. They may still be there when the scaffold is taken down, so could be an opportunity to store some at the back of the block. The render has been completed. Cladding has been delivered, ready for installation. That plus eaves and external paintwork will start this coming week The waterproofing has been completed. While we were there, workers were installing the architraves, skirting and internal doors. All the cabinetry has been delivered and will be installed this coming week. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ It looks like this photo is more about the port-a-loo, but that's the best angle I could get of the render from that side Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: Madison 35 by Clarendon Homes - Fixing stage 119May 18, 2019 10:47 am Week 15 update: Upstairs exterior has been completed - cladding, eaves and downpipes were fitted. Bricks were cleaned and exterior surfaces painted. Not sure when downstairs exterior will be finished, but really loving how the upstairs looks now. Looking forward to seeing when the render is painted, how that goes in with the bricks. Interior - front door has been fitted and we're now properly at lock up. Stairs are mostly complete - posts have been trimmed and balusters fitted. Plaster is done and under stair cupboard finished. Cavity sliding doors have been hung. And the cabinetry has been finished - really loving the colours, particularly how the kitchen has come up. So the coming week should see the scaffold removed and wet area tiling start. Oh and next door is flying along, they already have a roof and walls are wrapped. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ The laundry bench looks great, as does the cupboard, but it would have made more sense if the bench was the same colour... we're thinking about getting overheads in the same finish as the cupboard after handover Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Walk in pantry Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Kitchen - love the colours, how bright it is and the smooth finish of the overheads Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Stair case - just needs to be varnished. Not sure if it's being stained though... Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Front door is in - so much light! Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Bathroom ready for tiling Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Nice wide ensuite vanity; ready for tiling Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: Madison 35 by Clarendon Homes - Fixing stage 120May 20, 2019 12:58 pm Looking good. Are your overheads opened by a overhang or are they push-close mechanisms? the stair balustrades? There is nothing special about these and I imagine literally every stair installer will be able to do this. 1 6746 The two 15mm holes are obviously not compliant. The Dept of Fair Trading would love to see this one! Do the gutters pool water after it stops raining? Although it's… 4 7872 yes it does, you've just not understood it. theres a difference. 4 5332 |