Browse Forums General Discussion Re: Another defective house story 2Apr 20, 2019 9:44 am Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Another defective house story 11Apr 23, 2019 1:03 pm Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Another defective house story 14Apr 23, 2019 7:05 pm Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Another defective house story 16Apr 23, 2019 9:01 pm Harts Alex79 Unsure what the answer is but there does need to be something to protect those who opt to build or purchase a newly built house. To help others, I have uploaded original engineer's slab/footing design and main pages from Geotechnical report as unable to upload document. In Geotechnical report it did not report on the recently removed large tree in vicinity of bedroom 2 and family room. Also a shed was removed from the property. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Would be very interested to actually find out your contract date. AS2870 was updated/revised/amended in January 2011. It would be an interesting point to see if your soil report was done either after or before the acceptance into Standards Australia as your soil report attached still references AS2870-1996. Regards Geo1 Re: Another defective house story 17Apr 23, 2019 11:40 pm building-expert - The builder contacted his insurer in mid June '17 regarding making a claim for structural damage to my home. Insurer appointed Loss Adjuster who inspected property in Oct '17 who then appointed Engineer for inspection and report. Inconsistencies throughout report, dates wrong and also stated trees down east side of my property on neighbours side causing settlement. No trees down the east side of property. After I received report I sought legal advice. I have had an Engineer inspect and provide report and sought CCTV of drainage. kks - Thank you for clarifying what a quick plumb is. Geo 1 - I have checked the Geotechnical report and on-site classification took place on 19/01/2011. I just checked that AS2870-2011was released for publication on 17/01/2011. I purchased unit in June 2012. The Builder subdivided and built unit. Going back over documentation, Building Permit was issued on 22/09/2011. Dates on Structural Engineering plans Dates structural engineeringLike ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: Another defective house story 18Apr 24, 2019 12:11 am As I suspected you have not engaged your own expert, instead relying on other parties whose aim is to prevent liability. The simple fact is that your home under warranty has failed and should be either repaired or replaced under warranty. Unless you have done something to contribute to the problem the liability is builder's. Six years is a long time to waste. Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Another defective house story 19Apr 24, 2019 2:03 am Costs so far $12,000 getting an independent engineer to inspect and report. CCTV inspection and report. Legal advice. Emergency repairs to my home eg leaking ceiling caused ceiling damage, leaking pipes, leaking water pipe to home due to rubbing on brickwork, Carpenter to shave off external doors so I can lock them and be secure etc etc. Last year the builder was told by his insurer not to come and rectify any ongoing problems I was having.
In 2015 builder replaced north end of house perimeter concrete due to path moving away from brickwork (see pic). It’s apart again (see pic). For pictures I have removed the drainage sock. More water will get in down side of brickwork = more heave = more damage. This is where the system is wrong. Where does one find the money to seek justice at VCAT? It’s not just the financial burden over the years, it’s also the emotional stress and health issues that it all causes. Hi, We have a single story MacDonald Jones house, on a waffle pod slab with steel frame. Are we able to build a second story extension? Other info is we are 900mm from… 0 8505 We bought land in Tallawong Schofields NSW size 30m X 12.5m and planning to get double story house build around 350 sqm. We are thinking about having premium inclusions… 0 4099 Hi, Apologies - I know there is plenty out there on this but struggling to put together the puzzle. We're planning our garage/external laundry to master bedroom and… 0 11123 |