Browse Forums Building A New House Re: NBN point in your new house. 19Feb 19, 2019 8:55 pm DomoKB Yea I'm thinking the same too, will need the re-connection done once the house is built. You don't know down the line there might be more costs involved if it wasn't done properly, best to prevent that situation. In my case there will be as I won't accept aerial for the new house, but yeah, if they turn around and act like they don't know what I'm talking about, I have quotes, job numbers, written evidence in email, etc. Re: NBN point in your new house. 20May 09, 2019 7:46 am Hi Cheltsider, How did you go with the NBN installation? I am at Tender stage with my builder and they're guaranteeing that they will do the lead-in from the pole to the external side of my house for PCD and then on to the garage for the NTD. I live in the HFC - Aerial Lead-in area. I am still not convinced that they know what they're talking about. Sigh Building Standards; Getting It Right! Hi All, We have a fall from road to garage front. But we cannot put a drain/grate because no discharge point put by the builder. Now they complain not enough space for… 0 9244 Hi, I have this sewer inspection point sitting in an odd spot in the rear of my yard: https://imgur.com/ghLI98q What I'd like to do is put a firepit in that corner of… 0 6533 Yes well there solution is to blame everyone else while I a 65yr old woman with major medical problems have to just continue to boil water and wash myself in a bucket… 2 16019 |