Hi just started building, however I’ve checked the engineering and states the slab is built on rolled fill (not controlled) 300mm and the edge beams are on this too. Can you confirm if that’s okay? waffle slab, as there was a cut and fill on my Slight sloped sight. Been approved by building surveyor but friend advised it can’t be on rolled fill?
Thanks
Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅