Browse Forums Building A New House Re: What makes for "expensive" engineering for new home? 7Nov 30, 2018 7:55 am Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: What makes for "expensive" engineering for new home? 9Nov 30, 2018 9:03 am StructuralBIMGuy Sorry one question: This is custom build, not a volume build - does this make a difference with engineering? Re: What makes for "expensive" engineering for new home? 10Nov 30, 2018 10:12 am How much is he charging for what variation...More info required. Type of construction, ie, Timber or steel beam or concrete slab cantilever Type of Contract? ie Cost plus, lump sum, etc What stage are you at? , ie, pre-contact, post contract before they start on ste, Post contract During Construction.... All these & consequences should have been explained to you Making changes after you've paid a deposit will always cost more than pricing things up beforehand, as there is no incentive for the builder to sharpen his pencil on a competitive quite hth Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: What makes for "expensive" engineering for new home? 11Nov 30, 2018 10:16 am StructuralBIMGuy How much is he charging for what variation...More info required. Type of construction, ie, Timber or steel beam or concrete slab cantilever Type of Contract? ie Cost plus, lump sum, etc What stage are you at? , ie, pre-contact, post contract before they start on ste, Post contract During Construction.... All these & consequences should have been explained to you hth We are still at drawing stage - no charges yet, quotes for engineer ~3k (a few quotes). Fixed cost, plus extra for extra work if variations. SOG downstairs, timber / lightweight upstairs. Question is - will one engineer put in 300mm UB throughout where LVLs would do, etc. All hypothetical at this stage - seems like I need to just speak to the engineer. Re: What makes for "expensive" engineering for new home? 12Nov 30, 2018 10:27 am An LVL won't support cantilever brickwork? Find an designer/engineer and get another opinion. BTW a plan helps, avoid putting up the designer/Builder name...Copyright reasons Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: What makes for "expensive" engineering for new home? 13Nov 30, 2018 11:38 am Just remember when you minimize engineering needs, slabs etc, such has the Kings of minimizing engineering, slabs, most volume boys, you leave no room for error, absolutely none, so we get a mountain of problem homes when even questionable minimums are not done properly. Assuming you've modelled the TB8, TB10, TB12, TB2 & J1 joists/LVLs there, it appears as per drawing to me. There maybe should be an additional J1 between TB10 and T12 if… 3 31906 Thanks for all replies. I just noticed now the pictures I added to post right on top of page were wrong. I attached pictures showing "current" and my "suggested" floor… 9 14693 Is it just a report written to give to the bank initially and it is based on what and how your payments are made up for, or is it a full service where they go out and… 2 5712 |