Browse Forums Building A New House Re: Two Wells Dechellis Build 53Oct 25, 2018 11:13 am Monkey55 36k holy shirt! Monkey55 Quote: To the alfresco or the selections 36k? haha We had budgeted about 30k for an outdoor pavilion type structure so to have it under the main for for a bit more was nothing. The selections amount though... it just escalated so quickly! I must either be not very picky, or have no style at all, we were happy with pretty much all the standard fittings! All up we spent about 2.5k on joinery upgrades, 2.5k on aircon upgrades and like a few hundred bucks elsewhere on a water filter, oh and 1k on tiles. NicolleAW Oh nice! I would have loved for that to be us, some of our standard inclusions were pretty average. I think watching the block too much gave us expensive taste haha Haha, yeah the block is a bit evil. I said to myself at Pickards, as long as I dont hate it, dont even look at upgrades. Im not that fussed on sinks and taps, but I think our inclusions were quite nice. And we got 2.4m doors as standard. electrical inclusions were also pretty good. We may do downlights later. It makes it so hard to compare builders though. Re: Two Wells Dechellis Build 54Oct 25, 2018 11:35 am Monkey55 Monkey55 36k holy shirt! Monkey55 Quote: To the alfresco or the selections 36k? haha We had budgeted about 30k for an outdoor pavilion type structure so to have it under the main for for a bit more was nothing. The selections amount though... it just escalated so quickly! I must either be not very picky, or have no style at all, we were happy with pretty much all the standard fittings! All up we spent about 2.5k on joinery upgrades, 2.5k on aircon upgrades and like a few hundred bucks elsewhere on a water filter, oh and 1k on tiles. NicolleAW Oh nice! I would have loved for that to be us, some of our standard inclusions were pretty average. I think watching the block too much gave us expensive taste haha Haha, yeah the block is a bit evil. I said to myself at Pickards, as long as I dont hate it, dont even look at upgrades. Im not that fussed on sinks and taps, but I think our inclusions were quite nice. And we got 2.4m doors as standard. electrical inclusions were also pretty good. We may do downlights later. It makes it so hard to compare builders though. The block made me want to make our niche bigger in the ensuite and add another niche to the other bathroom and i was willing to spend the $700 that it cost because of a variation and admin for the change after final selections! The other half was not happy haha!! I wish we went in with that mentality. We didn't want to get something standard now and then in 12 months upgrade because it seemed like a waste of money to have something we no longer then need. I wish we did more research ourselves though because we would have purchased our own taps, toilets and bath and that kind of stuff and just got Dechellis to install. I'm sure this would have saved us a bit but oh well. Re: Two Wells Dechellis Build 57Oct 26, 2018 8:52 am NicolleAW ScottyG Looks great guys, I am building in Evanston! basically down the road, Enjoy ! Oh nice! Who are you building through and what point are you up to? I am building with Metro property developments, smooth sailing so far which is great.. Practical completion inspection on the 31/10 so hopefully in two weeks roughly ill have the keys! Re: Two Wells Dechellis Build 58Oct 26, 2018 8:58 am ScottyG NicolleAW ScottyG Looks great guys, I am building in Evanston! basically down the road, Enjoy ! Oh nice! Who are you building through and what point are you up to? I am building with Metro property developments, smooth sailing so far which is great.. Practical completion inspection on the 31/10 so hopefully in two weeks roughly ill have the keys! I haven't heard of them before but glad to hear all is going well! So close then, congrats Re: Two Wells Dechellis Build 59Nov 13, 2018 10:40 am Hi Nicolle, we would like to build with Dechellis after visiting several display homes. Is it possible to have most of our selection and upgrade done in the initial quote before signing off the preliminary? The grande spec is very good deal, but we cannot imagine the total cost with the selection Willing to see more progress photos of your dream home Re: Two Wells Dechellis Build 60Nov 13, 2018 11:03 am dbn Hi Nicolle, we would like to build with Dechellis after visiting several display homes. Is it possible to have most of our selection and upgrade done in the initial quote before signing off the preliminary? The grande spec is very good deal, but we cannot imagine the total cost with the selection Willing to see more progress photos of your dream home Hiya, After seeing a heap of display homes our decision to pick Dechellis was easy, their houses are beautiful and good quality. It is! Make a list of all the things you want and give them to the sales rep and they will be able to price it in for you Then its just cosmetic things you would mostly be upgrading at selections. I cant wait till I have more pictures to share... hopefully our framing goes up soon! Hi, We're building a double-storey in Perth and I'm undecided with the kitchen sink situation. I'm set on having the main sink with dishwasher in the scullery - and… 0 20912 2 2983 The price you're seeing for a high-spec 2-storey home in Perth sounds steep, but unfortunately, it's kind of the norm these… 8 7862 |